| Energy | Original | D | 12/4/2025 | SYSTEM | SYSTEM | Energy Department review for 2021 IBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2243636 |
| Mechanical | Original | D | 12/4/2025 | TREVORH | TREVORH | Disapproved; Need to see elevator Review comments addressed,Need to show required dampers for rated wall types. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2243635 |
| CO Springs Fire | Original | D | 12/2/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2242423 |
| Elevators | Original | D | 11/26/2025 | ROBERTV | ROBERTV | Need site specific shop drawings and power data for all elevators being installed. All elevator shop drawing and power data information must be situated in all of the required pages of this planset to include all work by others. Dimensions, notes and layouts must match in all trade pages. These submittals cannot be deferred and cannot use Basis of Design. Without these, a review cannot be performed and will continue to be disapproved
Also see sheets: 3A7.3, 3M1.1, 3E1.1, 3E2.1, And Elevator Shop Drawings. . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Elevators | 2241460 |
| Construction | Original | D | 11/25/2025 | JUSTINL | JUSTINL | See life safety plan, architectural and IECC documents for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2241392 |
| Electronic Plan | Original | / | 11/21/2025 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2239923 |
| Triage | Original | / | 11/21/2025 | QUINTONW | QUINTONW | Phased submittal upgraded to PHASED COMMERCIAL BLDG (THRU FINISH). All required departments reset to pending. | | Triage | 2239905 |
| Elevators | Original | A | 11/13/2025 | ROBERTV | ROBERTV | (Foundation Only) - Preliminary Sheet for Pit Dimensions provided.
RBD Note: TKE Endura Conventional Hydraulic Elevator | | Elevators | 2236364 |
| Energy | Original | A | 11/7/2025 | SYSTEM | SYSTEM | Energy Department review for 2021 IBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2234141 |
| Construction | Original | A | 11/7/2025 | SHELLEY | SHELLEY | | | Construction | 2234140 |
| | Original | / | 11/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2234041 |
| | Original | / | 11/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2234033 |
| Submittal 3 | Original | / | 11/6/2025 | SIERRAC | SIERRAC | Submittal #3 - Phased Commercial A (Foundation Only) | | Submittal 3 | 2234032 |
| Elevators | Original | A | 11/4/2025 | ROBERTV | ROBERTV | (Foundation Only) - Preliminary Sheet for Pit Dimensions provided.
RBD Note: TKE Endura Conventional Hydraulic Elevator | | Elevators | 2232921 |
| Energy | Original | D | 11/4/2025 | SYSTEM | SYSTEM | Energy Department review for 2021 IBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2232548 |
| Construction | Original | D | 11/4/2025 | SHELLEY | SHELLEY | Several required architectural sheets are missing. See commercial handout for all required sheets. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2232547 |
| Electronic Plan | Original | / | 11/4/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2232525 |
| Submittal 2 | Original | / | 11/4/2025 | SIERRAC | SIERRAC | Submittal #2 - Phased Commercial A (Foundation Only) | | Submittal 2 | 2232503 |
| CO Springs Fire | Original | A | 10/27/2025 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | chiptaylor | CO Springs Fire | 2229449 |
| Mechanical | Original | N | 10/22/2025 | TREVORH | TREVORH | Not A | | Mechanical | 2227752 |
| Energy | Original | D | 10/22/2025 | SYSTEM | SYSTEM | Energy Department review for 2021 IBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2227751 |
| Mechanical | Original | N | 10/22/2025 | DALEH | DALEH | Foundation only | | Mechanical | 2227750 |
| EPC Health Dept | Original | N | 10/22/2025 | HEALTHDEPT | HEALTHDEPT | Approved for foundation only. Per MLL, will touch base about requirements for science rooms with interior finish.
For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | EPC Health Dept | 2227728 |
| Mechanical | Original | / | 10/22/2025 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by Jordan Bruce | Bryan7025 | Mechanical | 2227202 |
| Elevators | Original | A | 10/20/2025 | ROBERTV | ROBERTV | (Foundation Only) - Preliminary Sheet for Pit Dimensions provided.
RBD Note: TKE Endura Conventional Hydraulic Elevator . | | Elevators | 2226206 |
| Construction | Original | D | 10/20/2025 | JUSTINL | JUSTINL | See architectural plans and code study form for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2225894 |
| Electronic Plan | Original | / | 10/17/2025 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2225394 |
| Electronic Plan | Original | / | 10/17/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2225361 |
| | Original | / | 10/17/2025 | SYSTEM | SYSTEM | Plan Review fees paid 10/17/2025 for plan submitted 10/09/2025. Submit Date updated to now. Plan now open for review. | | | 2225332 |
| Energy | Original | / | 10/9/2025 | SYSTEM | SYSTEM | Energy Department review for 2021 IBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2221818 |
| Floodplain | Original | N | 10/9/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6300000451) | | Floodplain | 2221816 |