| Energy | Original | A | 2/4/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2263215 |
| Plumbing | Original | A | 2/4/2026 | SHANEN | SHANEN | | | Plumbing | 2263214 |
| | Original | / | 2/4/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2263169 |
| | Original | / | 2/4/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2263160 |
| Submittal 3 | Original | / | 2/4/2026 | MELISSAF | MELISSAF | Submittal #3 | | Submittal 3 | 2263159 |
| Energy | Original | D | 2/3/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2262985 |
| Plumbing | Original | D | 2/3/2026 | SHANEN | SHANEN | Label the waste receptor (floor drain, hub drain, etc.) on the basement plan. Schedule the waste receptor if it is other than a hub drain. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2262984 |
| CSU Water | Original | A | 2/3/2026 | CSUREVIEW | CSUREVIEW | Comments addressed. PSD | PDosch | CSU Water | 2262969 |
| Submittal 2 | Original | / | 2/3/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2262948 |
| Energy | Original | D | 1/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2255727 |
| Electrical | Original | N | 1/13/2026 | CONNERM | CONNERM | | | Electrical | 2255726 |
| Electronic Plan | Original | / | 1/13/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2255725 |
| Plumbing | Original | D | 1/13/2026 | SHANEN | SHANEN | CSU comments must be addressed. Show compliance with section 608.15.2.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2255719 |
| CSU Water | Original | D | 1/13/2026 | CSUREVIEW | CSUREVIEW | A Utility Service Plan will be required for this project. Contact Utilities Development Services at (719) 668-8259 to discuss requirements.
Refer to the current Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form (currently plan has detail B1-8 from 2014). Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. PSD | PDosch | CSU Water | 2255675 |
| CSU Waste Water | Original | N | 1/13/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. PSD | PDosch | CSU Waste Water | 2255672 |
| Construction | Original | N | 1/13/2026 | SHELLEY | SHELLEY | No construction scope | | Construction | 2255645 |
| Enumeration | Original | N | 1/12/2026 | BECKYA | BECKYA | | | Enumeration | 2255361 |
| Electronic Plan | Original | / | 1/12/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2255356 |
| | Original | / | 1/12/2026 | SYSTEM | SYSTEM | Plan Review fees paid 01/12/2026 for plan submitted 01/12/2026. Submit Date updated to now. Plan now open for review. | | | 2255327 |
| Energy | Original | / | 1/12/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2255102 |
| Floodplain | Original | N | 1/12/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6330408015) | | Floodplain | 2255101 |