| Energy | Original | D | 3/2/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2274935 |
| Mechanical | Original | D | 3/2/2026 | TREVORH | TREVORH | Disapproved; Need to see construction Review comments addressed as well as Elevator review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2274934 |
| Electronic Plan | Original | / | 2/27/2026 | TREVORH | TREVORH | In Current Review by TREVORH | | Electronic Plan | 2274290 |
| Electronic Plan | Original | / | 2/27/2026 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Electronic Plan | 2274289 |
| EPC Health Dept | Original | D | 2/24/2026 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2270557 |
| County Zoning | Original | D | 2/24/2026 | DSDBENSON2 | DSDBENSON2 | El Paso County Planning and Community Development has not yet received an application for the Site Development Plan. Please log into EDARP (epcdevplanreview.com) to submit documents and complete the full review process. For any questions, please contact Miranda Benson at 719-520-7940 or MirandaBenson2@elpasoco.com. Thank you! | | County Zoning | 2270439 |
| Gas/Elec. Utils | Original | N | 2/20/2026 | CSUREVIEW | CSUREVIEW | No apparent conflicts. Contact Gas Field Engineering Team at 719-668-4985 with any questions. SSH | SHillman | Gas/Elec. Utils | 2269193 |
| Electrical | Original | D | 2/20/2026 | BERTHA | BERTHA | Provide only E sheets
Pending approval in Elevators - see Elevator review comments.
Comply with 250.102(C)(1)
Provide elevator horsepower on the one line.
Provide elevator over current device size ( Ampacity) on the one line.
Fault current information (SCCR, AIC, SCA) in tabular format at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Provide cord reel detail - comply with 314.23 (H)
Vestibules must be identified on electrical plans as conditioned or unconditioned. If the vestibule is conditioned or an air curtain is specified, show compliance with C403.4.1.4.
For mechanical systems located outside of a building, verify controls comply with C403.13.
Where applicable, Daylight Zones must be shown on the plans per C405.2.4.2 through C405.2.4.4.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
Controlled receptacles must be shown on the plan per C405.11 and the symbol used to mark these receptacles must be as shown in article 406.3(E) of the adopted National Electrical Code (NEC).
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.” . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2269130 |
| Electronic Plan | Original | / | 2/20/2026 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2269007 |
| Plumbing | Original | D | 2/20/2026 | SHANEN | SHANEN | Preliminary review. Provide only P sheets. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Each building shall comply with section 403.1 an approved variance will be required otherwise. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer in compliance with CO state amendment to section 708.1.3. Elevator sump discharge must show compliance with section 301.6 Exception: Floor drains, sumps and sump pumps shall be permitted at the base of the shaft, provided that they are indirectly connected to the plumbing system. Discharge elevator sump indirectly to a waste receptor capable of handling a minimum of 50 gpm (100 dfu). Provide gpm and/or square footage served by each component of the roof drainage system. Show the roof RD-1 is serving. Provide enlarged plumbing plans for all restrooms in building B. Provide code section that supports discharging a standpipe through an indirect waste connection. Alternates not considered. Provide a piping materials schedule. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Provide Isometric drawings for all restrooms in building B. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2268917 |
| Elevators | Original | D | 2/20/2026 | ROBERTV | ROBERTV | Need site specific shop drawings and power data for all elevators being installed. All elevator shop drawing and power data information must be situated in all of the required pages of this planset to include all work by others. Dimensions, notes and layouts must match in all trade pages. These submittals cannot be deferred and cannot use Basis of Design. Without these, a review cannot be performed and will continue to be disapproved
Also see sheets: G001B, A701B, M201B, E500B, P800B . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Elevators | 2268869 |
| Zoning/Planning | Original | / | 2/20/2026 | DSDBENSON2 | DSDBENSON2 | In Current Review by DSDBENSON2 | | Zoning/Planning | 2268831 |
| Construction | Original | D | 2/19/2026 | DOUGC | DOUGC | Code Study Form // Life Safety Plan // IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2268758 |
| Energy | Original | / | 2/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2266955 |
| Electronic Plan | Original | / | 2/9/2026 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2264785 |
| Enumeration | Original | D | 1/20/2026 | AMY | AMY | The 10 digit tax schedule number is not exempt but required and can be found on the El Paso County Assessor’s website above the address. A wrecking permit is required to be in place for the existing 6155 Fountain Valley School Road structure, prior to approval of this plan. On the demo page label the smaller building above 6330 with the address. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2257582 |
| Electronic Plan | Original | / | 1/20/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2257527 |
| Floodplain | Original | N | 1/19/2026 | KEITH | KEITH | | | Floodplain | 2257503 |
| | Original | / | 1/16/2026 | SYSTEM | SYSTEM | Plan Review fees paid 01/16/2026 for plan submitted 01/15/2026. Submit Date updated to now. Plan now open for review. | | | 2257458 |
| Fire | Original | / | 1/15/2026 | SYSTEM | SYSTEM | You will need to contact Fire department for approval prior to permit. This department will not review the plan electronically. | | Fire | 2256788 |
| Energy | Original | / | 1/15/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2256787 |
| Floodplain | Original | / | 1/15/2026 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 5500000164) | | Floodplain | 2256786 |