| Fountain Zoning | Original | D | 3/5/2026 | ZONINGF | ZONINGF | Plans disapproved pending applicant receiving City of Fountain approval and payment of fees. KM | KMartinez | Fountain Zoning | 2276671 |
| Fountain Fire | Original | D | 3/3/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | Fountain Fire | 2275152 |
| Fountain Hazmat | Original | N | 3/3/2026 | CSFIRE | CSFIRE | NA | Jacob.Watson | Fountain Hazmat | 2275148 |
| Energy | Original | D | 2/25/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2271164 |
| Mechanical | Original | D | 2/25/2026 | TREVORH | TREVORH | Disapproved; Mechanical sheets are missing the Gas plan Remove all gas related items from the plumbing sheets and submit on the mechanical . * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2271163 |
| Electrical | Original | D | 2/25/2026 | CONNERM | CONNERM | All information must be supplied and verified by engineer at time of plan submittal
Provide fault current information (SCCR, AIC, SCA) at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2271016 |
| Electronic Plan | Original | / | 2/25/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2270913 |
| Plumbing | Original | D | 2/25/2026 | SHANEN | SHANEN | Provide a two way fitting or two riser clean-out at the junction of each building drain and building sewer in compliance with CO state amendment to section 708.1.3. Water service sizing does not match referenced civil drawings. Building drains not shown on referenced civil drawings. Provide code section that supports not connecting a floor drain to the sanitary sewer. All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. Provide gpm and/or square footage served by each component of the roof drainage system. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Provide a legend to clarify abbreviations. Schedule NFWH, FD, PRD and ORD. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2270782 |
| Elevators | Original | N | 2/24/2026 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2270590 |
| Stratmoor Hills Water | Original | A | 2/24/2026 | STRATMOORWSD | STRATMOORWSD | Approved with backflow assembly added. | darrenadame | Stratmoor Hills Water | 2270178 |
| Stratmoor Hills Waste Water | Original | A | 2/24/2026 | STRATMOORWSD | STRATMOORWSD | | darrenadame | Stratmoor Hills Waste Water | 2270177 |
| EPC Health Dept | Original | N | 2/23/2026 | HEALTHDEPT | HEALTHDEPT | Not applicable. Per David Goode, core and shell only. TG | tguerrero | EPC Health Dept | 2270045 |
| CSU Contract Admin. | Original | A | 2/20/2026 | CSUAPPSPRM | CSUAPPSPRM | Commercial water meter sizing form approved and applicable development charges and fees paid. AMS | ASweet | CSU Contract Admin. | 2269101 |
| Gas/Elec. Utils | Original | D | 2/20/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. SSH | SHillman | Gas/Elec. Utils | 2269021 |
| Energy | Original | / | 2/20/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2269011 |
| Construction | Original | A | 2/20/2026 | BRIANB | BRIANB | | | Construction | 2269009 |
| Electronic Plan | Original | / | 2/19/2026 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2268461 |
| Enumeration | Original | D | 1/26/2026 | AMY | AMY | What is the height of the enclosure? If the height of the trash enclosure is above 7foot a separate address will be assigned and a separate permit will be required. Provide a site plan within the Architectural file for addressing purposes. Add the proposed suite numbers that were discussed prior. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2259871 |
| Electronic Plan | Original | / | 1/26/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2259861 |
| | Original | / | 1/26/2026 | SYSTEM | SYSTEM | Plan Review fees paid 01/26/2026 for plan submitted 01/26/2026. Submit Date updated to now. Plan now open for review. | | | 2259821 |
| Energy | Original | / | 1/26/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2259799 |
| Floodplain | Original | N | 1/26/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6504311007) | | Floodplain | 2259798 |