| EPC Health Dept | Original | A | 4/23/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. KB. | KBauer | EPC Health Dept | 2298232 |
| EPC Health Dept | Original | D | 4/17/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Please submit all applications through https://myhealthdepartment.com/EPCPH. Colorado Department of Health and Environment Air Pollutant Emission Notice (APEN) may be required for projects earthmoving > 25 acres. Contact CDPHE for more information or visit their website at https://cdphe.colorado.gov/apens-and-air-permits/do-you-need-an-apen-or-air-permit. AM | Amanda Furno | EPC Health Dept | 2294739 |
| Triview Water | Original | D | 4/16/2026 | TRIVIEWMETRO | TRIVIEWMETRO | 1. Please replace water meter piping detail 5 on P501 with Colorado Springs Utilities detail B4-8 “Typical Installation for 1-1/2” thru 6” Meters.” 2. According to the approved site development construction drawings, all irrigation is planned to be serviced by outdoor irrigation meter pits. However, Sheet P301 references irrigation detail 22 on P501, which shows an irrigation water piping and metering near the restrooms. Please remove the irrigation metering details and references if they are not needed, or coordinate with Triview if there has been a change to the irrigation metering. | rnortonTMD | Triview Water | 2294109 |
| Triview Waste Water | Original | D | 4/16/2026 | TRIVIEWMETRO | TRIVIEWMETRO | 1. On details 1 and 3 on Sheet P311, please modify the three floor drains in the coffee sales and prep areas to connect to the grease waste line instead of the sanitary waste line. | rnortonTMD | Triview Waste Water | 2294106 |
| Energy | Original | D | 4/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2294044 |
| Plumbing | Original | D | 4/16/2026 | SHANEN | SHANEN | Preliminary review. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Show vent piping for the grease interceptor. Provide a two way fitting or two riser clean-out at the junction of each building drain and building sewer in compliance with CO state amendment to section 708.1.3. All gas piping related items shall be on the mechanical plans.Remove ALL references to gas piping from the plumbing plans.Show compliance with section 1108. Not used per keynote 2. Clarify . ST-5 & 8 are for residential use only per manufacturer. Show clouded keynotes. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Provide a piping materials schedule on the plumbing plans per PPRBD plan review requirements. All plumbing fixtures must be scheduled with manufacturer model numbers on the plumbing plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2294043 |
| Mechanical | Original | D | 4/15/2026 | TREVORH | TREVORH | Disapproved; Provide the Natural gas pipe schedule, Include material and table from the 2021 IFGC where the system was sized. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2293226 |
| Tri-Lakes Hazmat (CSFD) | Original | A | 4/14/2026 | MONUMENTFIRE | MONUMENTFIRE | Monument Fire District – Plan Review Comments
All fire and life safety systems, features, and operations shall comply with the currently adopted 2021 International Fire Code (IFC) and all locally adopted amendments as enforced by Monument Fire District.
Permitting: All required fire permits shall be submitted online at: www.monumentfire.org/permits
Inspections: All inspections shall be scheduled a minimum of 48 hours in advance. Inspection requests may be made by contacting the assigned plan reviewer or by emailing: Permits@monumentfire.org
General Inquiries: For questions regarding permits, inspections, or plan review comments, contact: Permits@monumentfire.org | SBenson9 | Tri-Lakes Hazmat (CSFD) | 2293102 |
| Tri-Lakes Fire (CSFD) | Original | D | 4/14/2026 | MONUMENTFIRE | MONUMENTFIRE | Impact fees must be paid before release of permit. Reach out to Monument Fire for further details. ref Invoice MFD-INV-2026-0000041 | SBenson9 | Tri-Lakes Fire (CSFD) | 2293101 |
| Electrical | Original | D | 4/14/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2292852 |
| Electronic Plan | Original | / | 4/14/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2292771 |
| CSU Contract Admin. | Original | D | 4/14/2026 | CSUAPPSPRM | CSUAPPSPRM | Not in Colorado Springs Utilities territory. BS | bschifferstein | CSU Contract Admin. | 2292761 |
| Elevators | Original | N | 4/14/2026 | ANDREAL | ANDREAL | No conveyance in this scope of work. | | Elevators | 2292733 |
| Gas/Elec. Utils | Original | D | 4/14/2026 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities' gas/electric service territory. DMM | dmakings | Gas/Elec. Utils | 2292647 |
| Construction | Original | D | 4/14/2026 | JUSTINL | JUSTINL | See code study form, IECC document, architectural and structural plans for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2292602 |
| Energy | Original | / | 4/13/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2292290 |
| Electronic Plan | Original | / | 4/7/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2290098 |
| Floodplain | Original | N | 3/23/2026 | KEITH | KEITH | | | Floodplain | 2283011 |
| Enumeration | Original | D | 3/23/2026 | AMY | AMY | Add the street name Blevins Bucke Trail to the site plan G002. I see the legal description on a separate page. Place add the proposed legal description & current tax Schedule number on the Code Study form. Add the zip code to the Code Study as well. Approval of this plan is pending in the Enumerations department based on Enumerations needing to review the mylar prior to plat, collection of plat fees and a copy of the final recorded plat. Including the above information. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2282975 |
| Electronic Plan | Original | / | 3/23/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2282967 |
| | Original | / | 3/20/2026 | SYSTEM | SYSTEM | Plan Review fees paid 03/20/2026 for plan submitted 03/16/2026. Submit Date updated to now. Plan now open for review. | | | 2282889 |
| Fire | Original | / | 3/16/2026 | SYSTEM | SYSTEM | You will need to contact Fire department for approval prior to permit. This department will not review the plan electronically. | | Fire | 2280814 |
| Waste Water Div | Original | / | 3/16/2026 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2280815 |
| Hazmat | Original | / | 3/16/2026 | SYSTEM | SYSTEM | You will need to contact Hazmat department for approval prior to permit. This department will not review the plan electronically. | | Hazmat | 2280813 |
| Energy | Original | / | 3/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2280812 |