| Energy | Original | A | 5/14/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2307525 |
| Mechanical | Original | A | 5/14/2026 | DALEH | DALEH | | | Mechanical | 2307524 |
| Electrical | Original | A | 5/14/2026 | DANIELG | DANIELG | | | Electrical | 2307346 |
| Plumbing | Original | A | 5/14/2026 | SHANEN | SHANEN | | | Plumbing | 2307168 |
| Zoning/Planning | Original | / | 5/14/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2307133 |
| CSU Waste Water | Original | A | 5/14/2026 | CSUREVIEW | CSUREVIEW | Comments addressed. Interior Grease Trap approved via Variance letter by Springs Utilities Pretreatment. Size and type indicated in the variance letter. mjg | mgackle | CSU Waste Water | 2307128 |
| CSU Water | Original | N | 5/14/2026 | CSUREVIEW | CSUREVIEW | No new water service outside of building. mjg | mgackle | CSU Water | 2307127 |
| Construction | Original | A | 5/14/2026 | DANM | DANM | | | Construction | 2307121 |
| Submittal 2 | Original | / | 5/13/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2306923 |
| CO Springs Fire | Original | D | 5/5/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | CO Springs Fire | 2303299 |
| CO Springs Hazmat | Original | D | 5/5/2026 | CSFIRE | CSFIRE | See Fire comments | phil.valdez | CO Springs Hazmat | 2303298 |
| CO Springs Hazmat | Original | D | 5/5/2026 | CSFIRE | CSFIRE | See Fire comments | phil.valdez | CO Springs Hazmat | 2303297 |
| CO Springs DRE | Original | D | 4/28/2026 | SSADLER | SSADLER | Per the pre application summary, upload the correct parking calculations and the approved modified development. PLDO fees must be paid prior to building permit issuance. | | CO Springs DRE | 2299738 |
| Energy | Original | D | 4/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2299676 |
| Mechanical | Original | D | 4/27/2026 | DALEH | DALEH | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2299675 |
| Zoning/Planning | Original | / | 4/27/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2299258 |
| CSU Waste Water | Original | D | 4/24/2026 | CSUREVIEW | CSUREVIEW | Contact CSU Industrial Pretreatment representative Bob Bowren via email at fog@csu.org to determine if a variance for an interior grease interceptor is applicable. If applicable, provide a copy of the Variance letter in the building plan set. mjg | mgackle | CSU Waste Water | 2298626 |
| CSU Water | Original | D | 4/24/2026 | CSUREVIEW | CSUREVIEW | Will re-review water after wastewater comments are addressed. mjg | mgackle | CSU Water | 2298625 |
| Plumbing | Original | D | 4/24/2026 | SHANEN | SHANEN | Construction review comments regarding occupant load must be addressed to verify compliance with section 403.1. Provide required CSU variance letter for the indoor grease interceptor. Contact Robert Bowren at 719-668-1735 or fog@csu.org. CSU indoor grease interceptor variance letter will regulate which fixtures are required to discharge through the grease interceptor. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2298607 |
| Electrical | Original | D | 4/24/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2298598 |
| Electronic Plan | Original | / | 4/24/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2298587 |
| Construction | Original | D | 4/24/2026 | DANM | DANM | Indicate exit separation Calculate occupant load for entire private room Clarify reason door is rated * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2298559 |
| EPC Health Dept | Original | A | 4/23/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. KB. | KBauer | EPC Health Dept | 2298356 |
| Electronic Plan | Original | / | 4/17/2026 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2294646 |
| Enumeration | Original | N | 3/24/2026 | AMY | AMY | | | Enumeration | 2283837 |
| Electronic Plan | Original | / | 3/24/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2283832 |
| | Original | / | 3/24/2026 | SYSTEM | SYSTEM | Plan Review fees paid 03/24/2026 for plan submitted 03/24/2026. Submit Date updated to now. Plan now open for review. | | | 2283759 |
| Energy | Original | / | 3/24/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2283755 |
| Floodplain | Original | N | 3/24/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6429408015) | | Floodplain | 2283753 |