| CO Springs Fire | Original | D | 5/11/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2305307 |
| CO Springs Hazmat | Original | D | 5/11/2026 | CSFIRE | CSFIRE | See Fire Comments | Jacob.Watson | CO Springs Hazmat | 2305306 |
| Energy | Original | D | 4/29/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2300668 |
| Mechanical | Original | D | 4/29/2026 | TREVORH | TREVORH | Disapproved; Indicate plan North.include Room Names on plans matching the Architectural plans * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2300667 |
| CO Springs DRE | Original | A | 4/27/2026 | SSADLER | SSADLER | Approved for commercial interior finish. Use is compatible with the approved development plan. No exterior changes | | CO Springs DRE | 2299335 |
| Electrical | Original | D | 4/24/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2298630 |
| Electronic Plan | Original | / | 4/24/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2298619 |
| Plumbing | Original | D | 4/24/2026 | SHANEN | SHANEN | Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Provided water pipe size analysis data is incomplete. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Lavatories must show compliance with 2021 IECC section C404.5.1. Enumeration comments must be addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2298571 |
| CSU Water | Original | N | 4/23/2026 | CSUREVIEW | CSUREVIEW | No new water service outside of building. PSD | PDosch | CSU Water | 2298468 |
| CSU Waste Water | Original | N | 4/23/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. PSD | PDosch | CSU Waste Water | 2298467 |
| CSU Waste Water | Original | N | 4/23/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. PSD | PDosch | CSU Waste Water | 2298466 |
| Zoning/Planning | Original | / | 4/23/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2298383 |
| Construction | Original | D | 4/23/2026 | JUSTINL | JUSTINL | See code study and architectural plans for review comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2298316 |
| Energy | Original | / | 4/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2298167 |
| Electronic Plan | Original | / | 4/21/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2296913 |
| Enumeration | Original | D | 3/27/2026 | BECKYA | BECKYA | 1. Per permit history, and an address change from 2025, the address for this space is 6885 Campus Drive, suite 120. Please update all plan pages to show the correct address. 2. On page T00, please show the secondary addressing, current and proposed. See plan page for comment. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2285834 |
| | Original | / | 3/27/2026 | SYSTEM | SYSTEM | Plan Review fees paid 03/27/2026 for plan submitted 03/27/2026. Submit Date updated to now. Plan now open for review. | | | 2285612 |
| Energy | Original | / | 3/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2285455 |
| Floodplain | Original | N | 3/27/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6308303031) | | Floodplain | 2285454 |