| CO Springs DRE | Original | A | 5/29/2026 | SSADLER | SSADLER | Commercial interior remodel and window replacement approved. No changes to parking, landscaping, or footprint. | | CO Springs DRE | 2313917 |
| CSU Water | Original | N | 5/28/2026 | CSUREVIEW | CSUREVIEW | No new water service outside of building.MDA | malcuran | CSU Water | 2313466 |
| CSU Waste Water | Original | N | 5/28/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2313465 |
| Energy | Original | D | 5/28/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2313302 |
| Mechanical | Original | D | 5/28/2026 | DALEH | DALEH | No response to previous comment * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2313301 |
| Electrical | Original | D | 5/28/2026 | CONNERM | CONNERM | An approved AM&M is required to submit under 2024 IECC and CO MERSRC
Show compliance with C405.11 IECC
Clarify equipment as new or existing.
Provide name of panel and panel schedule with full demand load in amps. If added loads exceeds 5% of bus rating provide one-line diagram
Remove plan note referencing residential code * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2313038 |
| Electronic Plan | Original | / | 5/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2313013 |
| Zoning/Planning | Original | / | 5/28/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2312992 |
| Plumbing | Original | A | 5/28/2026 | SHANEN | SHANEN | | | Plumbing | 2312960 |
| Construction | Original | D | 5/27/2026 | DOUGC | DOUGC | Construction Protection * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2312951 |
| Submittal 2 | Original | / | 5/27/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2312211 |
| CO Springs Fire | Original | D | 5/22/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2310979 |
| CO Springs Fire | Original | D | 5/22/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2310978 |
| CO Springs Hazmat | Original | N | 5/22/2026 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2310977 |
| Energy | Original | D | 5/15/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2307869 |
| Mechanical | Original | D | 5/15/2026 | DALEH | DALEH | Show how new office is being heated and providing ventilation * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2307868 |
| CO Springs DRE | Original | A | 5/6/2026 | SSADLER | SSADLER | Commercial interior remodel and window replacement approved. No changes to parking, landscaping, or footprint. | | CO Springs DRE | 2303659 |
| CSU Water | Original | D | 5/6/2026 | CSUREVIEW | CSUREVIEW | Plumbing plans must specify the correct backflow device and show the correct meter configuration.MDA | malcuran | CSU Water | 2303539 |
| CSU Water | Original | D | 5/6/2026 | CSUREVIEW | CSUREVIEW | Plumbing plans must specify the correct backflow device and show the correct meter configuration.MDA | malcuran | CSU Water | 2303538 |
| CSU Waste Water | Original | D | 5/6/2026 | CSUREVIEW | CSUREVIEW | Plumbing plans must specify the correct backflow device and show the correct meter configuration.MDA | malcuran | CSU Waste Water | 2303537 |
| Plumbing | Original | D | 5/6/2026 | SHANEN | SHANEN | Construction review comments must be addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2303482 |
| Electrical | Original | D | 5/5/2026 | CONNERM | CONNERM | Provide electrical plans. Need AM&M to submit under 2024 IECC and CO MERSRC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2303345 |
| Energy | Original | / | 5/5/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2303344 |
| Zoning/Planning | Original | / | 5/5/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2303221 |
| Construction | Original | D | 5/5/2026 | DOUGC | DOUGC | CSF // LSP // Design Criteria * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2303165 |
| Electronic Plan | Original | / | 5/5/2026 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2303101 |
| Plumbing | Original | / | 4/28/2026 | WEBSITE | WEBSITE | Overtime Authorized for Plumbing by Tyler Gordon | mtnmanprojects | Plumbing | 2300294 |
| Mechanical | Original | / | 4/28/2026 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by Tyler Gordon | mtnmanprojects | Mechanical | 2300293 |
| Construction | Original | / | 4/28/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by Tyler Gordon | mtnmanprojects | Construction | 2300292 |
| Electrical | Original | / | 4/28/2026 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by Tyler Gordon | mtnmanprojects | Electrical | 2300291 |
| Enumeration | Original | N | 4/7/2026 | BRENT | BRENT | | | Enumeration | 2290054 |
| Electronic Plan | Original | / | 4/7/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2290048 |
| | Original | / | 4/7/2026 | SYSTEM | SYSTEM | Plan Review fees paid 04/07/2026 for plan submitted 04/07/2026. Submit Date updated to now. Plan now open for review. | | | 2290021 |
| Energy | Original | / | 4/7/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2289674 |
| Floodplain | Original | N | 4/7/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6418318018) | | Floodplain | 2289673 |