| Mechanical | Original | D | 6/17/2026 | DALEH | DALEH | No changes to sheet D1.0 See previous mechanical comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2322600 |
| CO Springs DRE | Original | A | 6/17/2026 | SSADLER | SSADLER | Previous approval comments still apply | | CO Springs DRE | 2322442 |
| Electrical | Original | D | 6/15/2026 | CONNERM | CONNERM | Equipment shows routing to a Panel D. Provide panel schedule for Panel D and show on one line. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2321187 |
| Zoning/Planning | Original | / | 6/15/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2321148 |
| Plumbing | Original | A | 6/15/2026 | SHANEN | SHANEN | See sheet D1.0 and A1.0 for plumbing scope. | | Plumbing | 2321140 |
| Construction | Original | A | 6/15/2026 | DOUGC | DOUGC | | | Construction | 2321099 |
| Plumbing | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Overtime approved for Plumbing by Approved Per Tommy Morgan | | Plumbing | 2320180 |
| Mechanical | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Overtime approved for Mechanical by Approved Per Tommy Morgan | | Mechanical | 2320179 |
| Electrical | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Overtime approved for Electrical by Approved Per Tommy Morgan | | Electrical | 2320178 |
| Construction | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Overtime approved for Construction by Approved Per Tommy Morgan | | Construction | 2320177 |
| EPC Health Dept | Original | A | 6/11/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. AB | abrannon | EPC Health Dept | 2319659 |
| Submittal 2 | Original | / | 6/11/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2319366 |
| CO Springs Fire | Original | N | 6/1/2026 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Fire | 2314625 |
| CO Springs Hazmat | Original | N | 6/1/2026 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Hazmat | 2314624 |
| CO Springs DRE | Original | A | 5/18/2026 | SSADLER | SSADLER | Approved for proposed exterior and interior changes. No changes to parking, occupancy, use, or landscaping are approved with this permit. Signage is not approved with this permit. | | CO Springs DRE | 2308470 |
| Mechanical | Original | D | 5/15/2026 | DALEH | DALEH | See sheet D1.0 for comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2308214 |
| EPC Health Dept | Original | D | 5/15/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. MT | mtemple | EPC Health Dept | 2308029 |
| Zoning/Planning | Original | / | 5/13/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2307072 |
| CSU Water | Original | N | 5/13/2026 | CSUREVIEW | CSUREVIEW | No plumbing scope of work. MLW | mlwilliams | CSU Water | 2307032 |
| CSU Waste Water | Original | N | 5/13/2026 | CSUREVIEW | CSUREVIEW | No plumbing scope of work. MLW | mlwilliams | CSU Waste Water | 2307031 |
| Electrical | Original | D | 5/13/2026 | CONNERM | CONNERM | Site plan must show all electrical service equipment and disconnects serving the structure and the location of all electrical equipment
Where applicable, Daylight Zones must be shown on the plans per C405.2.4.2 through C405.2.4.4
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.” * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2307000 |
| Electronic Plan | Original | / | 5/13/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2306947 |
| Plumbing | Original | A | 5/13/2026 | SHANEN | SHANEN | See sheet D1.0 and A1.0 for plumbing scope. | | Plumbing | 2306942 |
| Energy | Original | N | 5/13/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2306925 |
| Construction | Original | A | 5/13/2026 | DOUGC | DOUGC | | | Construction | 2306924 |
| Electronic Plan | Original | / | 5/13/2026 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2306879 |
| Enumeration | Original | N | 4/27/2026 | BRENT | BRENT | | | Enumeration | 2299391 |
| Electronic Plan | Original | / | 4/27/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2299370 |
| | Original | / | 4/27/2026 | SYSTEM | SYSTEM | Plan Review fees paid 04/27/2026 for plan submitted 04/24/2026. Submit Date updated to now. Plan now open for review. | | | 2299367 |
| Energy | Original | / | 4/24/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2299007 |
| Floodplain | Original | N | 4/24/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6418106004) | | Floodplain | 2299006 |