| Security Hazmat | Original | A | 9/2/2026 | SECURITYFIRE | SECURITYFIRE | HM for CO2 for Beverage dispensing - separate permit required from SFD DEFERRED SUBMITTAL - please have CO2 contractor submit directly to the SFD. FDMUS OK NO STAMP | SecurityFD1 | Security Hazmat | 2355540 |
| Security Fire | Original | A | 9/2/2026 | SECURITYFIRE | SECURITYFIRE | OK MAS for SFD No Stamp | SecurityFD1 | Security Fire | 2355534 |
| Fire | Original | / | 8/28/2026 | SYSTEM | SYSTEM | Contact Fire department for approval prior to permit | | Fire | 2353924 |
| Hazmat | Original | / | 8/28/2026 | SYSTEM | SYSTEM | Contact Hazmat department for approval prior to permit | | Hazmat | 2353923 |
| EPC Health Dept | Original | A | 8/28/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
The construction activity permit is valid as of August 21, 2026, and will remain valid through February 21, 2027. If the project is not completed within this six-month period, a new construction permit must be resubmitted.GGM | Heagmiranda | EPC Health Dept | 2353856 |
| EPC Health Dept | Original | D | 7/7/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Please submit all applications through https://myhealthdepartment.com/EPCPH. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2331026 |
| CSU Contract Admin. | Original | D | 6/30/2026 | CSUAPPSPRM | CSUAPPSPRM | Outside of CSU territory. Will need to follow up with correct provider for applicable fees. BS | bschifferstein | CSU Contract Admin. | 2328919 |
| Energy | Original | A | 6/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2328555 |
| Mechanical | Original | A | 6/30/2026 | TREVORH | TREVORH | Approved; State of Colorado approved plans. Mechanical sheets found on page 29 | | Mechanical | 2328554 |
| Electrical | Original | A | 6/29/2026 | DANIELG | DANIELG | | | Electrical | 2328090 |
| Construction | Original | A | 6/29/2026 | BPHILLIPS | BPHILLIPS | | | Construction | 2328068 |
| Submittal 2 | Original | / | 6/26/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2327306 |
| Widefield Water | Original | A | 5/27/2026 | WIDEFIELDWSD | WIDEFIELDWSD | | Widefield_Eng | Widefield Water | 2312639 |
| EPC Health Dept | Original | D | 5/20/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Please submit all applications through https://myhealthdepartment.com/EPCPH. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2310221 |
| Energy | Original | D | 5/19/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2309539 |
| Mechanical | Original | A | 5/19/2026 | TREVORH | TREVORH | Approved; Mechanical Located on page 29 . DOH approved plans | | Mechanical | 2309538 |
| County Zoning | Original | A | 5/19/2026 | DSDDEAN2 | DSDDEAN2 | Planning and Community Development approved the Site Development Plan at file number PPR2523 in February of 2026. Road Impact Fees are calculated as follows: General Commercial land use in the 10 MIL PID: $4,165/ksf x 2.824ksf = $11,761.96. Contact Bret Dilts with Department of Public Works regarding the Road Impact Fees. (bretdilts@elpasoco.com) | | County Zoning | 2309475 |
| Zoning/Planning | Original | / | 5/19/2026 | DSDDEAN2 | DSDDEAN2 | In Current Review by DSDDEAN2 | | Zoning/Planning | 2309457 |
| Widefield Waste Water | Original | A | 5/19/2026 | WIDEFIELDWSD | WIDEFIELDWSD | | Widefield_Eng | Widefield Waste Water | 2309387 |
| Widefield Waste Water | Original | A | 5/19/2026 | WIDEFIELDWSD | WIDEFIELDWSD | | Widefield_Eng | Widefield Waste Water | 2309386 |
| CSU Contract Admin. | Original | D | 5/18/2026 | CSUAPPSPRM | CSUAPPSPRM | Address is not within CSU service area. Please contact correct service provider. BS | bschifferstein | CSU Contract Admin. | 2308965 |
| Electrical | Original | D | 5/18/2026 | DANIELG | DANIELG | Pending construction approval. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2308872 |
| Electronic Plan | Original | / | 5/18/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2308870 |
| Plumbing | Original | A | 5/18/2026 | SHANEN | SHANEN | State of CO DOH approved plans. | | Plumbing | 2308861 |
| Construction | Original | D | 5/18/2026 | BPHILLIPS | BPHILLIPS | Site plan, soils, stamp on trash enclosure * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2308847 |
| Electronic Plan | Original | / | 5/18/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2308399 |
| Enumeration | Original | A | 4/29/2026 | BECKYA | BECKYA | Addressing plan in Civil/Site plans. Fuel canopy will be under separate submittal. 1 plan, 2 permits | | Enumeration | 2300459 |
| Electronic Plan | Original | / | 4/29/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2300432 |
| | Original | / | 4/28/2026 | SYSTEM | SYSTEM | Plan Review fees paid 04/28/2026 for plan submitted 04/28/2026. Submit Date updated to now. Plan now open for review. | | | 2300285 |
| Fire | Original | / | 4/28/2026 | SYSTEM | SYSTEM | You will need to contact Fire department for approval prior to permit. This department will not review the plan electronically. | | Fire | 2300231 |
| Hazmat | Original | / | 4/28/2026 | SYSTEM | SYSTEM | You will need to contact Hazmat department for approval prior to permit. This department will not review the plan electronically. | | Hazmat | 2300230 |
| Energy | Original | / | 4/28/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2300229 |
| Floodplain | Original | N | 4/28/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5515413055) | | Floodplain | 2300228 |