| CO Springs Fire | Original | D | 6/12/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2320280 |
| CO Springs Hazmat | Original | D | 6/12/2026 | CSFIRE | CSFIRE | See Fire Comments | Jacob.Watson | CO Springs Hazmat | 2320279 |
| CO Springs DRE | Original | A | 6/9/2026 | CHUDSPETH | CHUDSPETH | No change in Use, No CDI fees due. | | CO Springs DRE | 2318584 |
| Energy | Original | D | 5/27/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2312394 |
| Mechanical | Original | D | 5/27/2026 | TREVORH | TREVORH | Disapproved; Need to see Construction and plumbing review comments addressed to finish Mechanical review. Need to schedule all pool and spa heating equipment * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2312393 |
| CO Springs DRE | Original | D | 5/27/2026 | SSADLER | SSADLER | There may be fees associated with the proposed occupancy change. Contact Charla at charla.hudspeth@coloradosprings.gov
Plans are approved for an interior remodel once fees are paid. No changes to the exterior, landscaping, or parking. The only exterior change approved is the restriping of the existing parking stalls. | | CO Springs DRE | 2312218 |
| Electronic Plan | Original | / | 5/26/2026 | TREVORH | TREVORH | In Current Review by TREVORH | | Electronic Plan | 2312172 |
| Electrical | Original | D | 5/22/2026 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2310963 |
| Electronic Plan | Original | / | 5/22/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2310946 |
| Plumbing | Original | D | 5/21/2026 | SHANEN | SHANEN | Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Construction review comments regarding occupant load must be addressed to verify compliance with section 403.1. Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. All gas piping related items shall be on the mechanical plans.Remove ALL references to gas piping from the plumbing plans. Ball test is not an IPC approved method. P102: Keynote 3 must show compliance with section 608. Controls and hand showers shall comply with ICC A117.1-2017 section 608.4. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2310569 |
| Zoning/Planning | Original | / | 5/21/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2310524 |
| CSU Water | Original | D | 5/21/2026 | CSUREVIEW | CSUREVIEW | Requires CSU-approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions. SSH | SHillman | CSU Water | 2310409 |
| CSU Waste Water | Original | D | 5/21/2026 | CSUREVIEW | CSUREVIEW | Requires CSU-approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions. SSH | SHillman | CSU Waste Water | 2310408 |
| Construction | Original | D | 5/21/2026 | SHELLEY | SHELLEY | too many items, see plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2310368 |
| Electronic Plan | Original | / | 5/20/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2309667 |
| Enumeration | Original | D | 5/1/2026 | AMY | AMY | The address to this portion of the building is 3175 S Academy Blvd. Change the address on ALL pages to include the Code Study form. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2301693 |
| Electronic Plan | Original | / | 5/1/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2301677 |
| | Original | / | 5/1/2026 | SYSTEM | SYSTEM | Plan Review fees paid 05/01/2026 for plan submitted 05/01/2026. Submit Date updated to now. Plan now open for review. | | | 2301648 |
| Energy | Original | / | 5/1/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2301644 |
| Floodplain | Original | N | 5/1/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6435320007) | | Floodplain | 2301643 |