| CO Springs Fire | Original | D | 7/2/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2330127 |
| CO Springs Hazmat | Original | N | 7/2/2026 | CSFIRE | CSFIRE | NA | Jacob.Watson | CO Springs Hazmat | 2330126 |
| EPC Health Dept | Original | D | 6/24/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. MT | mtemple | EPC Health Dept | 2325973 |
| Energy | Original | D | 6/4/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2316278 |
| Mechanical | Original | D | 6/4/2026 | TREVORH | TREVORH | Disapproved; Need to provide Refrigeration calculations for the walk in cooler/Freezer or show sensors and alarms on plans.Need to show condensate drain line size,material and point of disposal on plans. show condenser location on plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2316277 |
| CSU Water | Original | N | 6/3/2026 | CSUREVIEW | CSUREVIEW | No new water service outside of building.MDA | malcuran | CSU Water | 2316018 |
| CSU Waste Water | Original | N | 6/3/2026 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2316016 |
| Plumbing | Original | D | 6/3/2026 | SHANEN | SHANEN | Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. Provide a piping materials schedule. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2315831 |
| Electrical | Original | D | 6/3/2026 | CONNERM | CONNERM | Address Construction comment. If there is a change of occupancy show compliance with ANSI 117.1 section 308 reach range for all new and existing equipment
Provide a note on the Electrical Plan specifying refrigeration performance per C403.11 and C403.11.3
Vestibules must be identified on plans as conditioned or unconditioned. If the vestibule is conditioned or an air curtain is specified, show compliance with C403.4.1.4.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
Clarify Panel A as MLO or MCB * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2315809 |
| Electronic Plan | Original | / | 6/3/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2315796 |
| Construction | Original | D | 6/3/2026 | BPHILLIPS | BPHILLIPS | Appears to be a change of occupancy from A-2 to B. See plan for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2315794 |
| Electronic Plan | Original | / | 6/2/2026 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2315288 |
| Enumeration | Original | N | 5/15/2026 | AMY | AMY | | | Enumeration | 2307850 |
| Electronic Plan | Original | / | 5/15/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2307847 |
| | Original | / | 5/14/2026 | SYSTEM | SYSTEM | Plan Review fees paid 05/14/2026 for plan submitted 05/14/2026. Submit Date updated to now. Plan now open for review. | | | 2307583 |
| Energy | Original | / | 5/14/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2307185 |
| Floodplain | Original | N | 5/14/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6220201036) | | Floodplain | 2307184 |