| CO Springs Fire | Original | D | 7/22/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | jt09ff | CO Springs Fire | 2337750 |
| CO Springs Hazmat | Original | N | 7/22/2026 | CSFIRE | CSFIRE | | jt09ff | CO Springs Hazmat | 2337749 |
| Energy | Original | D | 7/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2335084 |
| Plumbing | Original | D | 7/16/2026 | SHANEN | SHANEN | DF does not comply with section 410.3. Provide a piping insulation schedule. Water service sizing does not match referenced civil plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2335083 |
| Mechanical | Original | A | 7/8/2026 | DALEH | DALEH | | | Mechanical | 2331886 |
| Electrical | Original | A | 7/7/2026 | BERTHA | BERTHA | | | Electrical | 2330919 |
| Elevators | Original | N | 7/6/2026 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2330917 |
| CO Springs DRE | Original | D | 7/2/2026 | SSADLER | SSADLER | The financial instrument must be posted prior to building permit issuance. Contact Charla at charlahudspeth@coloradosprings.gov to discuss impact fees that may be owed. | | CO Springs DRE | 2330148 |
| City Engr | Original | D | 7/1/2026 | DSOSA | DSOSA | Please submit financial assurances for the street improvements and drainage, along with the $75k for the signal upgrade and modifications. These must be posted with Andrea.Acker@coloradosprings.gov prior to building permit issuance by City Engineering. | | City Engr | 2329523 |
| CSU Contract Admin. | Original | D | 6/30/2026 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
BS | bschifferstein | CSU Contract Admin. | 2329127 |
| CSU Water | Original | D | 6/30/2026 | CSUREVIEW | CSUREVIEW | ADD METER DETAIL/CLEARANCE TO PLUMBING PLAN.
Refer to the current Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans.MDA | malcuran | CSU Water | 2329086 |
| CSU Waste Water | Original | A | 6/30/2026 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set.MDA | malcuran | CSU Waste Water | 2329084 |
| Gas/Elec. Utils | Original | A | 6/30/2026 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. Approved development plan and utility construction drawings provided with permit set.MDA | malcuran | Gas/Elec. Utils | 2329081 |
| Zoning/Planning | Original | / | 6/30/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2329044 |
| Construction | Original | D | 6/30/2026 | DOUGC | DOUGC | Accessibility // Trusses * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2328945 |
| Energy | Original | / | 6/30/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2328916 |
| Electronic Plan | Original | / | 6/30/2026 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2328861 |
| Plumbing | Original | / | 6/25/2026 | WEBSITE | WEBSITE | Overtime Authorized for Plumbing by JENNIFER COOPER | jennifercooper | Plumbing | 2326716 |
| Mechanical | Original | / | 6/25/2026 | WEBSITE | WEBSITE | Overtime Authorized for Mechanical by JENNIFER COOPER | jennifercooper | Mechanical | 2326712 |
| Electrical | Original | / | 6/25/2026 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by JENNIFER COOPER | jennifercooper | Electrical | 2326711 |
| Elevators | Original | / | 6/25/2026 | WEBSITE | WEBSITE | Overtime Authorized for Elevators by JENNIFER COOPER | jennifercooper | Elevators | 2326710 |
| Construction | Original | / | 6/25/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by JENNIFER COOPER | jennifercooper | Construction | 2326708 |
| Enumeration | Original | A | 6/16/2026 | BECKYA | BECKYA | | | Enumeration | 2322045 |
| Electronic Plan | Original | / | 6/16/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2322013 |
| | Original | / | 6/16/2026 | SYSTEM | SYSTEM | Plan Review fees paid 06/16/2026 for plan submitted 06/16/2026. Submit Date updated to now. Plan now open for review. | | | 2321959 |
| Energy | Original | / | 6/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2321946 |
| Floodplain | Original | N | 6/16/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6428400027) | | Floodplain | 2321945 |