Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Home
Plan #
  
Type
 
Plan
Owner
Address
2855 MESA RD, COLORADO SPRINGS, CO 80904
Parcel Info
7335302063
Truss P/SF
30 (Elevation: 6,449 Feet)
Project
ELEVATOR MODERNIZATION (
437
)
Type Of Plan
Normal
Review Type
Electronic
Fire District
COLORADO SPRINGS FIRE DIST
Submit Date
Approval Date
Location
Resubmittal
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 7
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Construction
N
0
C
Construction
Electrical
A
0
E
Electrical
Elevators
A
0
X
Elevators
Energy
N
G
Energy
Floodplain
N
W
Floodplain
Mechanical
N
0
M
Mechanical
Plumbing
N
0
P
Plumbing
Log Entries: 14
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
Electrical
Original
A
10/29/2026
CONNERM
CONNERM
Electrical
2376696
Electronic Plan
Original
/
10/29/2026
CONNERM
CONNERM
In Current Review by CONNERM
Electronic Plan
2376655
Mechanical
Original
N
10/28/2026
TREVORH
TREVORH
Not Applicable; no mechanical scope.
Mechanical
2376194
Elevators
Original
A
10/28/2026
ROBERTV
ROBERTV
New Alpha Controller, w/ Generator. A17.1 - 2019, 2023 RBC.
Variance only allows omission of the text feature inside the elevator car, a camera inside the elevator car is still required and must be able to be accessed and monitored 24/7.
Because this elevator is connected to Generator Power, an illuminated indicator will be required at the designated level.
Alpha Controller Short Circuit Current Rating (SCCR) was not provided with these plans, PPRBD will make an exception to providing this as part of the plan because there has been documentation already provided to PPRBD from Alpha. Next submission of a controller will require the submitting party to provide this documentation to obtain an approved plan.
.
Elevators
2376109
Submittal 2
Original
/
10/27/2026
NICOLASV
NICOLASV
Submittal #2
Submittal 2
2375824
Plumbing
Original
N
7/10/2026
SHANEN
SHANEN
Plumbing
2333203
Mechanical
Original
D
7/7/2026
TREVORH
TREVORH
Disapproved; Need to see elevator approval
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Mechanical
2331061
Electrical
Original
D
7/1/2026
BERTHA
BERTHA
Pending Elevator review approval.
.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Electrical
2329287
Electronic Plan
Original
/
7/1/2026
BERTHA
BERTHA
In Current Review by BERTHA
Electronic Plan
2329286
Elevators
Original
D
6/30/2026
ROBERTV
ROBERTV
Code Study Form is incomplete, No elevator equipment specs are provided, Scope of work needs to be applicable to only this project, See Electrical page E600. Re-review all......
RBD Note: Elevator is connected to generator power, and is required to be outfitted with a jewel at the designated level. Any ventilation equipment in the elevator machine room is also required to be connected to generator power.
.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Elevators
2329274
Construction
Original
N
6/29/2026
SHELLEY
SHELLEY
No construction scope
Construction
2328435
Original
/
6/18/2026
SYSTEM
SYSTEM
Plan Review fees paid 06/18/2026 for plan submitted 06/18/2026. Submit Date updated to now. Plan now open for review.
2323702
Energy
Original
N
6/18/2026
SYSTEM
SYSTEM
Energy Department review not required under 2023 PPRBC when IECC is N/A
Energy
2323629
Floodplain
Original
N
6/18/2026
RBD GIS
RBD GIS
Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7335302063)
Floodplain
2323628