| EPC Health Dept | Original | A | 8/17/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. AB | abrannon | EPC Health Dept | 2348312 |
| EPC Health Dept | Original | D | 8/6/2026 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2344367 |
| Monument Zoning | Original | N | 8/6/2026 | TOWNOFMON | TOWNOFMON | | bholtztom | Monument Zoning | 2344300 |
| Monument Hazmat | Original | A | 7/29/2026 | MONUMENTFIRE | MONUMENTFIRE | This review is based on the 2021 International Fire Code (IFC), as adopted and amended by Monument Fire District, including all applicable policies and standards. This review is limited to fire and life safety considerations and does not constitute approval of structural, electrical, plumbing, or other disciplines.
Because of Compressed gas for soda fountain, permit may be required | SBenson9 | Monument Hazmat | 2340770 |
| Monument Fire | Original | A | 7/29/2026 | MONUMENTFIRE | MONUMENTFIRE | This review is based on the 2021 International Fire Code (IFC), as adopted and amended by Monument Fire District, including all applicable policies and standards. This review is limited to fire and life safety considerations and does not constitute approval of structural, electrical, plumbing, or other disciplines.
New Construction/Tenant Finish permit required
Field Verification Approved plans are subject to field verification. Installations not in accordance with approved plans or applicable codes may require correction.
Inspection Scheduling All inspections shall be requested a minimum of 48 hours in advance through Monument Fire. Contact permits@monumentfire.org Approval by Monument Fire does not relieve the applicant from compliance with all other applicable codes, ordinances, and requirements from other agencies having jurisdiction. | SBenson9 | Monument Fire | 2340769 |
| Mechanical | Original | A | 7/28/2026 | TREVORH | TREVORH | Approved; | | Mechanical | 2340181 |
| Electrical | Original | A | 7/28/2026 | CONNERM | CONNERM | | | Electrical | 2340050 |
| Plumbing | Original | A | 7/28/2026 | SHANEN | SHANEN | | | Plumbing | 2340034 |
| Electronic Plan | Original | / | 7/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2340033 |
| Construction | Original | A | 7/28/2026 | SHELLEY | SHELLEY | | | Construction | 2340021 |
| Energy | Original | N | 7/28/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2340020 |
| Electronic Plan | Original | / | 7/28/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2340017 |
| Triview Water | Original | A | 7/15/2026 | TRIVIEWMETRO | TRIVIEWMETRO | | rnortonTMD | Triview Water | 2334799 |
| Triview Waste Water | Original | A | 7/15/2026 | TRIVIEWMETRO | TRIVIEWMETRO | | rnortonTMD | Triview Waste Water | 2334798 |
| Enumeration | Original | N | 7/15/2026 | AMY | AMY | Enumerations corrected the address on ComCheck lighting and ComCheck Mechanical. | | Enumeration | 2334446 |
| Electronic Plan | Original | / | 7/15/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2334434 |
| | Original | / | 7/15/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/15/2026 for plan submitted 07/09/2026. Submit Date updated to now. Plan now open for review. | | | 2334415 |
| Water Division | Original | / | 7/9/2026 | SYSTEM | SYSTEM | You will need to contact Water Division department for approval prior to permit. This department will not review the plan electronically. | | Water Division | 2332799 |
| Waste Water Div | Original | / | 7/9/2026 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2332800 |
| Energy | Original | / | 7/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2332798 |
| Floodplain | Original | N | 7/9/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7125301003) | | Floodplain | 2332796 |