| EPC Health Dept | Original | N | 9/10/2026 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1787 is valid from 8.11.2026-3.12.2027. To continue any earthmoving operations after 3.12.2027, please reapply for a new permit online through https://myhealthdepartment.com/EPCPH. For questions, contact Environmental Health at 719-578-3199 option 3.GGM | Heagmiranda | EPC Health Dept | 2358141 |
| Gas/Elec. Utils | Original | A | 9/10/2026 | CSUREVIEW | CSUREVIEW | NOT IN CSU ELECTRIC TERRITORY. CSU Field Engineer to determine final gas meter, service line location. Contact Field Engineering at 719-668-4985 (Gas) for service line approval form or with any questions. AM/MG | amagoon | Gas/Elec. Utils | 2357834 |
| Energy | Original | D | 9/9/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2357599 |
| Plumbing | Original | A | 9/9/2026 | SHANEN | SHANEN | | | Plumbing | 2357598 |
| Electrical | Original | D | 9/9/2026 | CONNERM | CONNERM | Fault current must be verified at the time of review by engineer.
Provide withstand rating for RTUs * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2357477 |
| Electronic Plan | Original | / | 9/9/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2357460 |
| Construction | Original | A | 9/9/2026 | SHELLEY | SHELLEY | | | Construction | 2357386 |
| Electronic Plan | Original | / | 9/9/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2357371 |
| Enumeration | Original | A | 9/8/2026 | BRENT | BRENT | | | Enumeration | 2357109 |
| Electronic Plan | Original | / | 9/8/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2357106 |
| Submittal 2 | Original | / | 9/4/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2356830 |
| Woodmen Hills Water | Original | D | 8/18/2026 | WOODMENHLSMETRO | WOODMENHLSMETRO | Need irrigation plans, need consumption forms, and need updated details in civil plans | Cody.Ritter | Woodmen Hills Water | 2349159 |
| Woodmen Hills Waste Water | Original | D | 8/18/2026 | WOODMENHLSMETRO | WOODMENHLSMETRO | need irrigation plans and consumption forms. plan set needs updated details. tap fees must be paid. | Cody.Ritter | Woodmen Hills Waste Water | 2349157 |
| Falcon Fire (CSFD) | Original | D | 8/18/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | jt09ff | Falcon Fire (CSFD) | 2348948 |
| Falcon Hazmat (CSFD) | Original | N | 8/18/2026 | CSFIRE | CSFIRE | Shell building only - no hazmat review at this time | jt09ff | Falcon Hazmat (CSFD) | 2348943 |
| Energy | Original | D | 8/10/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2345694 |
| Mechanical | Original | A | 8/10/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2345693 |
| Plumbing | Original | D | 8/10/2026 | SHANEN | SHANEN | Water service and building drain locations do not match the provided utility plan. 4" x 1-1/2" overflow opening is undersized to serve noted gpm and does not comply with section 1108.3. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2345603 |
| Electrical | Original | D | 8/10/2026 | CONNERM | CONNERM | Provid fault current information (SCCR, AIC, SCA) at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
Label panels on floor plan
Provide demand load in amps for Panel MP2 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2345213 |
| Electronic Plan | Original | / | 8/10/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2345180 |
| Elevators | Original | N | 8/7/2026 | JOHN | JOHN | no elevator in scope | | Elevators | 2345106 |
| EPC Health Dept | Original | D | 8/6/2026 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. Please submit all applications through https://myhealthdepartment.com/EPCPH. For questions, contact Environmental Health at 719-578-3199 option 3. KB. | KBauer | EPC Health Dept | 2344412 |
| CSU Contract Admin. | Original | A | 8/3/2026 | CSUAPPSPRM | CSUAPPSPRM | No applicable fees due this plan set. JMD | jdemello | CSU Contract Admin. | 2342576 |
| Gas/Elec. Utils | Original | D | 8/3/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. PSD | PDosch | Gas/Elec. Utils | 2342026 |
| County Zoning | Original | D | 8/3/2026 | DSDRANGEL | DSDRANGEL | Must upload the approved site development plan from EPC Planning & Community Development. If you have not started a project yet, contact the planner of the day at dsd-pod@elpasoco.com for project set up. | | County Zoning | 2341912 |
| Zoning/Planning | Original | / | 8/3/2026 | DSDRANGEL | DSDRANGEL | In Current Review by DSDRANGEL | | Zoning/Planning | 2341908 |
| Construction | Original | D | 7/31/2026 | DOUGC | DOUGC | IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2341840 |
| Energy | Original | / | 7/31/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2341703 |
| Electronic Plan | Original | / | 7/31/2026 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2341698 |
| Plumbing | Original | / | 7/27/2026 | MELISSAF | MELISSAF | Overtime approved for Plumbing by Katie Kahler | | Plumbing | 2339188 |
| Mechanical | Original | / | 7/27/2026 | MELISSAF | MELISSAF | Overtime approved for Mechanical by Katie Kahler | | Mechanical | 2339187 |
| Electrical | Original | / | 7/27/2026 | MELISSAF | MELISSAF | Overtime approved for Electrical by Katie Kahler | | Electrical | 2339186 |
| Construction | Original | / | 7/27/2026 | MELISSAF | MELISSAF | Overtime approved for Construction by Katie Kahler | | Construction | 2339185 |
| Enumeration | Original | D | 7/24/2026 | BRENT | BRENT | The street names are shown incorrectly on the architectural site plan on page A100 Show the tax schedule number in the correct location on the code study form. Show the correct legal description on the code study form. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2339072 |
| | Original | / | 7/24/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/24/2026 for plan submitted 07/24/2026. Submit Date updated to now. Plan now open for review. | | | 2338947 |
| Waste Water Div | Original | / | 7/24/2026 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2338657 |
| Water Division | Original | / | 7/24/2026 | SYSTEM | SYSTEM | You will need to contact Water Division department for approval prior to permit. This department will not review the plan electronically. | | Water Division | 2338656 |
| Energy | Original | N | 7/24/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2338655 |
| Floodplain | Original | N | 7/24/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5301008004) | | Floodplain | 2338654 |