| Triview Water | Original | D | 9/8/2026 | TRIVIEWMETRO | TRIVIEWMETRO | 1. Plumbing – please provide whole- building domestic water overview, similar to P2.1. 2. Domestic water service appears to enter near the Honda showroom single door, then be piped into the fire riser room. Why does the DCW not enter the fire riser directly? 3. Water service on plumbing plan (1.5”) does not match service line size on Civil Plans (2”) and no reducer is shown. Please clarify water service size, meter size. Please provide water service entry detail including isolation valving, cross connection control and meter. 4. Please indicate location of fire service entry (presumably the fire riser room?) and provide entry detail including cross connection control. Fire service should not be metered. 5. Fixture counts have been estimated at 97 WFSU ~= 66.5 gpm. This is the upper limit for a 2” service line and will require a 1.5” meter. If this number does not match your projections, please provide a fixture count table to support your sizing. | rnortonTMD | Triview Water | 2357061 |
| Triview Waste Water | Original | D | 9/8/2026 | TRIVIEWMETRO | TRIVIEWMETRO | 1. Please resubmit with construction drawings, not the PUD drawings, and incorporate CDs comments provided directly on August 20, 2026. 2. A two way cleanout must be provided at the building, please indicate this on the civil and plumbing plans. 3. The civil and plumbing plans show a grease interceptor - this must be a sand/oil interceptor not a grease interceptor which is used for separating food grease. Please use the detail provided with CDs comments on August 20th. Please indicate the size of the sand/oil interceptor on plans. | rnortonTMD | Triview Waste Water | 2357060 |
| Energy | Original | D | 8/25/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2352021 |
| Mechanical | Original | D | 8/25/2026 | TREVORH | TREVORH | Disapproved; Gas piping plan is missing from this Mechanical submittal package * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2352020 |
| Electrical | Original | D | 8/24/2026 | BERTHA | BERTHA | Provide Colorado professional engineer stamp and signature
Provide all conductor size, type and quantity.
Provide fault current information (SCCR, AIC, SCA)in tabular format at all of the following locations. 1. All new panelboards and switchboards 2. All new transfer equipment 3. All new industrial control panels 4. All new air conditioning and refrigeration equipment 5. At any of the above locations when refed
Specify Major or Minor garage - comply with 511 NEC
Comply with 2021 IECC
Comply with Colorado Model Electric Ready and Solar Ready Code.
See the following for Electrical Plan Review Requirements - https://www.pprbd.org/File/ByAlias/ElectricalReview
Complete re-review required.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2351394 |
| Plumbing | Original | D | 8/24/2026 | SHANEN | SHANEN | Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. The following general note must be included on the plumbing plans: A Final Commissioning Report shall be delivered to the building owner per section C408.2.5 of the 2021 IECC. Colorado licensed design professional stamp and signature required on all drawings. All gas piping related items shall be on the mechanical plans. Remove ALL references to gas piping from the plumbing plans. Connections between drainage piping and fittings shall comply with section 706. Water service sizing does not match provide utility plan C-3. Heated water supply piping shall comply with 2021 IECC section C404. Lavatories shall comply with 2021 IECC section C404.5.1. Show vent penetrations. Water heater detail must show compliance with 2021 IECC section 404.3. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2351213 |
| Electronic Plan | Original | / | 8/24/2026 | SHANEN | SHANEN | In Current Review by SHANEN | | Electronic Plan | 2351129 |
| Elevators | Original | N | 8/21/2026 | JOHN | JOHN | No Elevator in scope of work | | Elevators | 2351088 |
| Monument Hazmat | Original | A | 8/20/2026 | MONUMENTFIRE | MONUMENTFIRE | New construction is subject to impact fees. An invoice has been sent to the applicant for this permit.
WRC permits are required for this permit. Please apply at www.monumentfire.org/permits
This review is based on the 2021 International Fire Code (IFC), as adopted and amended by Monument Fire District, including all applicable policies and standards. This review is limited to fire and life safety considerations and does not constitute approval of structural, electrical, plumbing, or other disciplines. | SBenson9 | Monument Hazmat | 2350244 |
| Monument Fire | Original | A | 8/20/2026 | MONUMENTFIRE | MONUMENTFIRE | New construction is subject to impact fees. An invoice has been sent to the applicant for this permit.
WRC permits are required for this permit. Please apply at www.monumentfire.org/permits
This review is based on the 2021 International Fire Code (IFC), as adopted and amended by Monument Fire District, including all applicable policies and standards. This review is limited to fire and life safety considerations and does not constitute approval of structural, electrical, plumbing, or other disciplines. | SBenson9 | Monument Fire | 2350242 |
| CSU Contract Admin. | Original | D | 8/19/2026 | CSUAPPSPRM | CSUAPPSPRM | Project is out of Colorado Springs Utitlies Service territory. Please follow-up with correct provider for applicable fees. JMD | jdemello | CSU Contract Admin. | 2349705 |
| Gas/Elec. Utils | Original | D | 8/19/2026 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions.MDA | malcuran | Gas/Elec. Utils | 2349507 |
| Construction | Original | D | 8/19/2026 | BRIANB | BRIANB | See - code study form / Sheets A001 - A101 - A131 - A701 / MTL BLDING C1 / IECC * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2349457 |
| Electronic Plan | Original | / | 8/19/2026 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2349401 |
| Electronic Plan | Original | / | 8/12/2026 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2346765 |
| Enumeration | Original | A | 8/12/2026 | BECKYA | BECKYA | | | Enumeration | 2346662 |
| Electronic Plan | Original | / | 8/12/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2346653 |
| | Original | / | 8/11/2026 | SYSTEM | SYSTEM | Plan Review fees paid 08/11/2026 for plan submitted 08/11/2026. Submit Date updated to now. Plan now open for review. | | | 2346324 |
| Water Division | Original | / | 8/11/2026 | SYSTEM | SYSTEM | You will need to contact Water Division department for approval prior to permit. This department will not review the plan electronically. | | Water Division | 2346166 |
| Waste Water Div | Original | / | 8/11/2026 | SYSTEM | SYSTEM | You will need to contact Waste Water Div department for approval prior to permit. This department will not review the plan electronically. | | Waste Water Div | 2346167 |
| Energy | Original | / | 8/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2346165 |
| Floodplain | Original | N | 8/11/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7126002032) | | Floodplain | 2346164 |