| Energy | Original | D | 11/20/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2385028 |
| Electrical | Original | A | 11/20/2026 | DANIELG | DANIELG | | | Electrical | 2385027 |
| CO Springs DRE | Original | A | 11/20/2026 | CVANAPPLEDORN | CVANAPPLEDORN | Previous approval comments still apply. | | CO Springs DRE | 2384989 |
| CSU Electric | Original | A | 11/20/2026 | CSUREVIEW | CSUREVIEW | No apparent conflicts. MN | mnelson | CSU Electric | 2384986 |
| Zoning/Planning | Original | / | 11/20/2026 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2384984 |
| Construction | Original | D | 11/20/2026 | SHELLEY | SHELLEY | Provide listed assembly for how structural floor reinforcement will be protected as required for type of construction (IIA, 1-hour required) * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2384970 |
| Submittal 2 | Original | / | 11/20/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2384919 |
| CO Springs DRE | Original | A | 9/29/2026 | CVANAPPLEDORN | CVANAPPLEDORN | Commercial interior change of electrical equipment related to battery storage. No change of use or occupancy. No exterior work. | | CO Springs DRE | 2364679 |
| CSU Gas | Original | A | 9/25/2026 | CSUREVIEW | CSUREVIEW | No apparent conflicts.JL | jluukkonen | CSU Gas | 2363852 |
| Zoning/Planning | Original | / | 9/25/2026 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2363832 |
| CSU Electric | Original | D | 9/25/2026 | CSUREVIEW | CSUREVIEW | Submit Electric Load Data Form to CSU Field Engineering. Form can be found at: https://www.csu.org/hubfs/Document-Library/ElectricLoadData.pdf?hsLang=en RD | RDuran | CSU Electric | 2363811 |
| Energy | Original | D | 9/25/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2363788 |
| Electrical | Original | D | 9/25/2026 | DANIELG | DANIELG | Comply with 240.4(C) and 240.6(B) NEC or comply with 240.6(C) NEC//Provide load summary for panel schedules. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2363787 |
| Electronic Plan | Original | / | 9/25/2026 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2363765 |
| Construction | Original | D | 9/25/2026 | SHELLEY | SHELLEY | Clarify if 'temporary structural' frame will be removed once equipment is in place or if it will remain. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2363747 |
| Enumeration | Original | N | 9/23/2026 | BECKYA | BECKYA | Tax Schedule Number on the Code Study Form was updated for you. The tax schedule number will never be "Exempt" this is the 10-digit number listed above the address on the Assessor's website. | | Enumeration | 2362942 |
| | Original | / | 9/23/2026 | SYSTEM | SYSTEM | Plan Review fees paid 09/23/2026 for plan submitted 09/23/2026. Submit Date updated to now. Plan now open for review. | | | 2362868 |
| Energy | Original | / | 9/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2362693 |
| Floodplain | Original | N | 9/23/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6331104001) | | Floodplain | 2362692 |