Electrical | Original | D | 11/19/2021 | DANIELG | DANIELG | 1. Installation must comply with 230.85 NEC.
2. Remove parallel neutral (ground) from PV service conductors.
3. Provide service rated PV disconnect with N-G bond.
4. Comply 705.11(B) NEC. Neutral conductor is undersized.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1596892 |
Electronic Plan | Original | / | 11/19/2021 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1596887 |
CO Springs DRE | Original | N | 11/18/2021 | KDODGE | KDODGE | Flush mount roof solar panels and/or PV solar panels do not exceed maximum residential height requirements. (see full review) | | CO Springs DRE | 1596277 |
Zoning/Planning | Original | / | 11/18/2021 | KDODGE | KDODGE | In Current Review by KDODGE | | Zoning/Planning | 1596275 |
Construction | Original | A | 11/17/2021 | DANM | DANM | | | Construction | 1595850 |
Electronic Plan | Original | / | 11/17/2021 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1595849 |
Floodplain | Original | N | 11/17/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6421107020) | | Floodplain | 1595471 |