Mechanical | Original | N | 2/4/2022 | JUSTINC | JUSTINC | No new or revised mechanical scope indicated | | Mechanical | 1632290 |
Electronic Plan | Original | / | 2/4/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1632287 |
Resubmittal 1 | Original | / | 2/4/2022 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1632223 |
Mechanical | Original | D | 12/1/2021 | JUSTINC | JUSTINC | Please clarify if there will be any changes or modifications to the HVAC systems. If none please indicate that on the plan.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1601280 |
Construction | Original | N | 12/1/2021 | SHELLEY | SHELLEY | Building permits are not required to replace drywall or insulation. Exposed framing cavities are to be filled with insulation. Permits may still be required for electrical, mechanical and plumbing. | | Construction | 1601092 |
Electronic Plan | Original | / | 12/1/2021 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 1601087 |
Floodplain | Original | N | 11/19/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6512111010) | | Floodplain | 1597062 |