Electrical | Original | D | 4/14/2022 | RICHG | RICHG | Comply with 706.15
Comply with 7061.31 (F)
Site plan disapproved pending construction approval (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1665489 |
Electronic Plan | Original | / | 4/14/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1665484 |
Construction | Original | D | 4/14/2022 | DANM | DANM | Sheet PV-3.0 which includes the design criteria still seems to be missing from the submittal. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1665048 |
Electronic Plan | Original | / | 4/14/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1665042 |
Resubmittal 4 | Original | / | 4/13/2022 | KALLISTAJ | KALLISTAJ | Resubmittal #4 | | Resubmittal 4 | 1664756 |
Electrical | Original | D | 4/6/2022 | RICHG | RICHG | Comply with 706.31 (F)
ESS output must be protected by and over-current protection device before it passes through the wall. See red line on the one line (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1661045 |
Electronic Plan | Original | / | 4/6/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1660987 |
Construction | Original | D | 4/4/2022 | DANM | DANM | Sheet PV-3.0 that includes the design criteria still seems to be missing from the submittal.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1660167 |
Electronic Plan | Original | / | 4/4/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1660164 |
Resubmittal 3 | Original | / | 4/4/2022 | GITA | GITA | Resubmittal #3 | | Resubmittal 3 | 1659701 |
Electrical | Original | D | 3/28/2022 | RICHG | RICHG | Label floor plan individually ( not grouped) to match one line.
Comply with 706.15 and 706.31 (F)
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1656519 |
Electronic Plan | Original | / | 3/28/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1656187 |
Construction | Original | D | 3/22/2022 | DANM | DANM | Sheet PV-3.0 is still missing which includes the design criteria
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1653352 |
Electronic Plan | Original | / | 3/22/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1653344 |
Resubmittal 2 | Original | / | 3/21/2022 | ANDREAL | ANDREAL | Resubmittal #2 | | Resubmittal 2 | 1653245 |
Electrical | Original | D | 2/22/2022 | SHELBY | SHELBY | 1. Missing floor plan. 2. Include specification for micro grid interconnection device. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1639951 |
Electronic Plan | Original | / | 2/22/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1639940 |
Construction | Original | D | 2/14/2022 | DANM | DANM | Original site plan PDF had three pages - please resubmit all pages.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1636466 |
Electronic Plan | Original | / | 2/14/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1636461 |
Resubmittal 1 | Original | / | 2/11/2022 | AUSTINK | AUSTINK | Resubmittal #1 | | Resubmittal 1 | 1635925 |
Electrical | Original | D | 12/8/2021 | SHELBY | SHELBY | 1. Provide floor plan showing all electrical gear in this scope of work labeled the same as on the one line. Submit as other. 2. Comply 706.15 NEC and 706.31(F) NEC. 3. Include specification for the rapid shutdown device in specifications folder. Include all specifications when uploading to the specifications folder. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1605209 |
Electronic Plan | Original | / | 12/3/2021 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1602838 |
CO Springs DRE | Original | N | 11/30/2021 | ESHAFER | ESHAFER | Flush mount solar panels and/or PV solar panels do not exceed the maximum residential height requirements. | | CO Springs DRE | 1600305 |
Zoning/Planning | Original | / | 11/30/2021 | ESHAFER | ESHAFER | In Current Review by ESHAFER | | Zoning/Planning | 1600301 |
Construction | Original | A | 11/30/2021 | DANM | DANM | | | Construction | 1600272 |
Electronic Plan | Original | / | 11/30/2021 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1600264 |
Floodplain | Original | N | 11/29/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6414421001) | | Floodplain | 1599770 |