Required Departments: 4
|
|
|
Log Entries: 6
|
|
Electrical | Original | D | 12/21/2021 | DANIELG | DANIELG | 1. Provide utility approval with battery.
2. Installation of Energy Storage Systems (ESS) requires both a floor plan and site plan submittal. On the floor plan please clearly indicate exterior walls and interior walls and the location of all electrical gear. All electrical gear must be uniquely identified and labeled ( Disconnects). Labeling of electrical gear must match throughout the plan set. Please submit the required floor plan under the “Other” category.
3. Installation must comply with 706.15(A)(3) NEC and 706.31(F) NEC
4. Provide all specifications for Sanctuary ESS.
5. Provide listing from a NRTL for Sanctuary ESS as a system.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1611591 | Electronic Plan | Original | / | 12/21/2021 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1611539 | CO Springs DRE | Original | N | 12/15/2021 | ESHAFER | ESHAFER | Flush mount solar panels and/or PV solar panels do not exceed the maximum residential height requirements. (see full review) | | CO Springs DRE | 1608760 | Zoning/Planning | Original | / | 12/15/2021 | ESHAFER | ESHAFER | In Current Review by ESHAFER | | Zoning/Planning | 1608756 | Construction | Original | A | 12/15/2021 | GITA | GITA | | | Construction | 1608344 | Floodplain | Original | N | 12/14/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6507302015) | | Floodplain | 1607528 |
|
| |
|