Required Departments: 4
|
|
|
Log Entries: 6
|
|
Construction | Original | A | 4/27/2022 | SHELLEY | SHELLEY | | | Construction | 1672270 | Submittal 2 | Original | / | 4/26/2022 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1671632 | Mechanical | Original | A | 4/25/2022 | DALEH | DALEH | | | Mechanical | 1670880 | Construction | Original | D | 4/22/2022 | SHELLEY | SHELLEY | Steel to steel connections not using a listed connector must be stamped by a Colorado licensed design professional. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1670127 | Monument Zoning | Original | N | 4/18/2022 | TOWNOFMON | TOWNOFMON | Pikes Peak Regional Building inspection is needed. The Town of Monument zoning approval is based on the submission to Monument provided within our Cascade permitting system. If that submission differs or is changed within Pikes Peak Regional Building, we cannot be held liable for the zoning decision. | trust@tomgov.org | Monument Zoning | 1666528 | Floodplain | Original | N | 4/8/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7125202012) | | Floodplain | 1662592 |
|
| |
|