Electrical | Original | D | 5/21/2022 | DANIELG | DANIELG | 1. Provide document showing the rack and modules have been evaluated (by an NRTL) together as a system for grounding the modules per 690.43 NEC (Usually found in the rack installation manual).
2. Supply side taps must land in a OCPD.
3. Remove ground from PV service conductors.
4. Provide PV service disconnect with N-G bond.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1685934 |
Electronic Plan | Original | / | 5/21/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1685933 |
CO Springs DRE | Original | N | 5/20/2022 | ACOOPER | ACOOPER | Flush roof mount PV system and/or PV solar does not exceed residential zoning height requirements | | CO Springs DRE | 1685423 |
Construction | Original | D | 5/19/2022 | CGIECK | CGIECK | Update ASCE to 7-10 and Wind exposure category to C. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1685253 |
Electronic Plan | Original | / | 5/19/2022 | CGIECK | CGIECK | In Current Review by CGIECK | | Electronic Plan | 1685250 |
Floodplain | Original | N | 5/18/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6408414016) | | Floodplain | 1684536 |