Electrical | Original | A | 8/5/2022 | DANIELG | DANIELG | | | Electrical | 1724184 |
Electronic Plan | Original | / | 8/5/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1724098 |
Mechanical | Original | A | 8/2/2022 | DALEH | DALEH | | | Mechanical | 1722044 |
Construction | Original | A | 8/2/2022 | MICHAELA | MICHAELA | | | Construction | 1721961 |
Submittal 2 | Original | / | 8/1/2022 | STEPHANIEV | STEPHANIEV | Submittal #2 | | Submittal 2 | 1721698 |
Electrical | Original | D | 6/23/2022 | DANIELG | DANIELG | 1. Provide panel schedule for MSP.
2. Show compliance with the following code sections.
- 210.8 NEC-. GFCI protection.
- 210.12 NEC. Arc fault protection.
- 210.52 NEC. Required outlets.
- 210.11(C) NEC. Branch circuits required.
- 406.12 NEC. Tamper resistant receptacles.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1703473 |
Electronic Plan | Original | / | 6/15/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1699075 |
Mechanical | Original | D | 6/14/2022 | DALEH | DALEH | Need to fill out whole house ventilation sheet (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1698011 |
Construction | Original | A | 6/14/2022 | MICHAELA | MICHAELA | | | Construction | 1697777 |
Electronic Plan | Original | / | 6/13/2022 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Electronic Plan | 1697362 |
WP Waste Water | Original | A | 6/8/2022 | KSIMPKINS | KSIMPKINS | Approved. Sewer tap fees have been paid for both buildings. | | WP Waste Water | 1694864 |
WP Water | Original | A | 6/8/2022 | KSIMPKINS | KSIMPKINS | Approved with conditions. Due to the change in use, a water tap fee is due for this building since it was never paid for in the past. With the current fixture count the amount due is $11,077.00. This Tap Fee is due prior to the permit being issued, City Code reference 13.26.020. The backflow device can remain installed and does not have to be tested on an annual basis or the Woodland Park Utilities Dept. or City Inspector can verify there is a meter loop/horn installed where the water meter resides and the backflow device can be removed. If there is not a meter loop/horn, one can be provided by the City for free but must be installed by a plumber and the Woodland Park Utilities Dept. can reset the water meter.
The water and sewer rates will be changed to residential. | | WP Water | 1694863 |
WP Fire (CSFD Commercial) | Original | N | 6/7/2022 | DBURGESS | DBURGESS | N/A per Fire Chief Tyler Lambert - verbal to D. Burgess on 6/07/2022. Would like address change to Forest Edge Road due to driveway access. | | WP Fire (CSFD Commercial) | 1694271 |
WP Zoning | Original | A | 6/7/2022 | DBURGESS | DBURGESS | Zoning Change in Use ZDP approved by Senior Planner Chelsea Stromberg on 5/04/2022 | | WP Zoning | 1694158 |
WP Zoning | Original | A | 6/3/2022 | AWOLIN | AWOLIN | Change in use ZDP #202203067 approved 5/4/2022 with 9 conditions. Condition #5: Prior to occupancy, submit the WP Park Capital Fee in the amount of $2133.00. | | WP Zoning | 1692262 |
WP Floodplain | Original | N | 6/3/2022 | AWOLIN | AWOLIN | Verified not in floodplain. Above ground detention pond is south of site. | | WP Floodplain | 1692244 |
WP Enumeration | Original | A | 6/3/2022 | AWOLIN | AWOLIN | Owner, address, and parcel number verified. | | WP Enumeration | 1692241 |