Electrical | Original | A | 8/16/2022 | DANIELG | DANIELG | | | Electrical | 1728518 |
Electronic Plan | Original | / | 8/16/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1728499 |
Construction | Original | A | 8/16/2022 | GITA | GITA | | | Construction | 1728411 |
Submittal 4 | Original | / | 8/15/2022 | SIERRAC | SIERRAC | Submittal #4 | | Submittal 4 | 1727998 |
Electrical | Original | D | 8/8/2022 | DANIELG | DANIELG | Missing floor plan.
Electrical review incomplete.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1724685 |
Electronic Plan | Original | / | 8/8/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1724658 |
Construction | Original | A | 8/5/2022 | GITA | GITA | | | Construction | 1724215 |
Submittal 3 | Original | / | 8/3/2022 | STEPHANIEV | STEPHANIEV | Submittal #3 | | Submittal 3 | 1723205 |
Electrical | Original | D | 7/21/2022 | DANIELG | DANIELG | 1. List conductors from ESS disconnect to Enphase smart switch.
2. Conductors for generator are undersized.
3. Show KW for generator on the one-line.
4. Show MSD upstream from enphase smart switch.
5. Show New-subpanel on the one-line.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1716774 |
Electronic Plan | Original | / | 7/21/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1716732 |
Construction | Original | A | 7/20/2022 | GITA | GITA | | | Construction | 1716380 |
Submittal 2 | Original | / | 7/20/2022 | STEPHANIEV | STEPHANIEV | Submittal #2 | | Submittal 2 | 1716376 |
Electrical | Original | D | 7/18/2022 | DANIELG | DANIELG | 1. Installation of Energy Storage Systems (ESS) requires both a floor plan and site plan submittal. On the floor plan please clearly indicate exterior walls and interior walls and the location of all electrical gear. All electrical gear must be uniquely identified and labeled ( Disconnects). Labeling of electrical gear must match throughout the plan set. Please submit the required floor plan under the “Other” category.
2. Installation must comply with 706.15(A)(3) NEC and 706.31(F) NEC
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1714979 |
Electronic Plan | Original | / | 7/18/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1714978 |
County Zoning | Original | N | 7/18/2022 | DSDRANGEL | DSDRANGEL | | | County Zoning | 1714847 |
Zoning/Planning | Original | / | 7/18/2022 | DSDRANGEL | DSDRANGEL | In Current Review by DSDRANGEL | | Zoning/Planning | 1714844 |
Construction | Original | A | 7/18/2022 | GITA | GITA | | | Construction | 1714811 |
Floodplain | Original | N | 7/14/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5520202099) | | Floodplain | 1713209 |