CO Springs DRE | Original | A | 9/7/2022 | KSCHOTT | KSCHOTT | approval for attached garage addition. no disturbance of any kind or vegetation removal is permitted within the preservation area/no build area per the approved hillside site plan. All grading must conform with approved hillside site plan. Please note that limit of disturbance boundary and any preservation easements must be marked with 4' orange construction fencing according to approved plan; stockpiling to occur within LOD also according to approved site plan. Hillside site inspections will occur throughout construction to ensure compliance | | CO Springs DRE | 1738299 |
Zoning/Planning | Original | / | 9/1/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1736513 |
Stormwater | Original | A | 8/31/2022 | EWANG | EWANG | | | Stormwater | 1736347 |
Submittal 3 | Original | / | 8/31/2022 | KALLISTAJ | KALLISTAJ | Submittal #3 | | Submittal 3 | 1735931 |
CO Springs DRE | Original | D | 8/26/2022 | KSCHOTT | KSCHOTT | 1. sign/date hillside certification statement 2. include a note on site plan "no disturbance will occur within the preservation area during construction of proposed garage and retaining walls. 3. Scrub oak is called out in the preservation area near the proposed garage; include those scrub oak clusters sf in vegetation analysis fee table 4. Provide confirmation from ashley whitworth that a fire vegetation inspection has occurred kerri.schott@coloradosprings.gov | | CO Springs DRE | 1734416 |
Stormwater | Original | A | 8/24/2022 | JMOXNESS | JMOXNESS | | | Stormwater | 1732746 |
Zoning/Planning | Original | / | 8/23/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1732595 |
Submittal 2 | Original | / | 8/23/2022 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1732366 |
CO Springs Fire | Original | A | 8/22/2022 | CSFIRE | CSFIRE | We are pleased to inform you this plan is approved
You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS!
ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | dwithee | CO Springs Fire | 1731860 |
CO Springs Fire | Original | / | 8/22/2022 | CSFIRE | CSFIRE | | dwithee | CO Springs Fire | 1731843 |
CO Springs DRE | Original | D | 8/16/2022 | KSCHOTT | KSCHOTT | 1. Must show scrub oak clusters & mature trees of 12" diameter to be SAVED within 50' of the limit of disturbance boundary and into the preservation area on site plan. These preserved trees must then be included in the vegetation fee table assessment 2. Show beginning grade/finished grade values at proposed corners of addition 3. stake corners and confirm with Fire inspector that existing vegetation within preservation easement/no build area will be removed (ashley.whitworth@coloradosprings.gov) 4. Proposed retaining wall is very close to no build area. Must allow for construction of wall without any land disturbance/grading to no build area (usually 5-8'). What is distance from wall to no build area? Also include a note "NO land disturbance will occur within the no build area during construction of retaining walls or garage" 5. Confirm total number of garage door car ENTRIES between existing and proposed. Cannot exceed 4 entries total (example: 2 double doors or 4 single doors) 6. Include a point of contact phone number/email address on site plan for hillside inspection coordination kerri.schott@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1729053 |
Stormwater | Original | A | 8/12/2022 | JMOXNESS | JMOXNESS | | | Stormwater | 1727277 |
Zoning/Planning | Original | / | 8/11/2022 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 1727030 |
Construction | Original | A | 8/11/2022 | JASONB | JASONB | Approved garage addition - Soils report attached to plan submission closed by reviewer, not the referenced testing / Need to submit correct soils to inspection staff prior to first inspection | | Construction | 1726769 |
Electronic Plan | Original | / | 8/11/2022 | JASONB | JASONB | In Current Review by JASONB | | Electronic Plan | 1726754 |
Stormwater | Original | / | 8/10/2022 | SYSTEM | SYSTEM | Parcel 7333204018 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 1726153 |
Floodplain | Original | N | 8/10/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7333204018) | | Floodplain | 1726154 |