Electrical | Original | A | 12/14/2023 | DANIELG | DANIELG | | | Electrical | 1940486 |
Electronic Plan | Original | / | 12/14/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1940474 |
Construction | Original | A | 12/13/2023 | SHELLEY | SHELLEY | | | Construction | 1940258 |
Enumeration | Original | A | 12/13/2023 | AMY | AMY | | | Enumeration | 1940199 |
Electronic Plan | Original | / | 12/13/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1940151 |
Submittal 6 | Original | / | 12/13/2023 | BRIANNAM | BRIANNAM | Submittal #6 | | Submittal 6 | 1939975 |
CO Springs Fire | Original | A | 12/12/2023 | CSFIRE | CSFIRE | We are pleased to inform you this plan is approved. You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account.
ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION!
fees are per dwelling unit | dwithee | CO Springs Fire | 1939076 |
CO Springs DRE | Original | A | 12/6/2023 | TBAXTER | TBAXTER | No change from previous approvals of this plan. TPB | | CO Springs DRE | 1936975 |
Electrical | Original | D | 12/4/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1935202 |
Electronic Plan | Original | / | 12/4/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1935197 |
Zoning/Planning | Original | / | 11/30/2023 | TBAXTER | TBAXTER | In Current Review by TBAXTER | | Zoning/Planning | 1934448 |
Construction | Original | A | 11/30/2023 | SHELLEY | SHELLEY | | | Construction | 1934398 |
Enumeration | Original | D | 11/30/2023 | AMY | AMY | A PAGES, STRUCTURAL sheets had the incorrect address and/or lot number and tax schedule number. Look at the title blocks for this information being incorrect as well. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1934353 |
Electronic Plan | Original | / | 11/30/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1934338 |
Submittal 5 | Original | / | 11/30/2023 | BRIANNAM | BRIANNAM | Submittal #5 | | Submittal 5 | 1934139 |
CO Springs Fire | Original | D | 11/27/2023 | CSFIRE | CSFIRE | PREVIOUS COMMENTS NOT ADDRESSED
We regret to inform you this plan is disapproved. You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | dwithee | CO Springs Fire | 1932257 |
CO Springs DRE | Original | A | 11/14/2023 | TBAXTER | TBAXTER | The architectural plans are not consistent with the development plan amendment uploaded. The amendment created a three pack product type. An minor modification to the approved development plan is not necessary. TPB | | CO Springs DRE | 1928442 |
Electrical | Original | D | 11/9/2023 | DANIELG | DANIELG | Footprint (site plan) showing all electrical service equipment and disconnects serving the structure (utility meter, disconnecting means, and unit panel).
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1926210 |
Electronic Plan | Original | / | 11/9/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1926204 |
Zoning/Planning | Original | / | 11/8/2023 | TBAXTER | TBAXTER | In Current Review by TBAXTER | | Zoning/Planning | 1925556 |
Construction | Original | A | 11/8/2023 | SHELLEY | SHELLEY | | | Construction | 1925262 |
Enumeration | Original | A | 11/7/2023 | AMY | AMY | A PAGES, M2, STRUCTURAL sheets had the incorrect address and/or lot number and tax schedule number. If any of these sheets get changed out, correct them. | | Enumeration | 1924467 |
Electronic Plan | Original | / | 11/7/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1924355 |
Submittal 4 | Original | / | 11/6/2023 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 1923920 |
CO Springs Fire | Original | D | 9/26/2023 | CSFIRE | CSFIRE | Walk OK - resubmittal qualifies for walkthrough. please see link for how to request a walkthrough review from Fire: https://coloradosprings.gov/document/walk-thrumemo.pdf
We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | rpeterson | CO Springs Fire | 1904379 |
CO Springs DRE | Original | D | 9/18/2023 | TBAXTER | TBAXTER | Upload signed and recorded final plat. TPB. | | CO Springs DRE | 1901169 |
Electrical | Original | D | 9/14/2023 | DANIELG | DANIELG | Footprint (site plan) showing all electrical service equipment and disconnects serving the structure (utility meter, disconnecting means, and unit panel).
1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1899658 |
Electronic Plan | Original | / | 9/14/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1899656 |
Zoning/Planning | Original | / | 9/13/2023 | TBAXTER | TBAXTER | In Current Review by TBAXTER | | Zoning/Planning | 1899120 |
Construction | Original | D | 9/13/2023 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1899074 |
Enumeration | Original | D | 9/12/2023 | AMY | AMY | Information not corrected on M-2. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1898471 |
Electronic Plan | Original | / | 9/12/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1898464 |
Submittal 3 | Original | / | 9/12/2023 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 1898455 |
CO Springs Fire | Original | D | 6/8/2023 | CSFIRE | CSFIRE | previous comments not addressed or corrected.
We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | jt09ff | CO Springs Fire | 1853569 |
Health Dept. | Original | N | 6/2/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1329 is valid from 6/01/2023 to 12/01/2023. To continue any earthmoving operations after 12/01/2023, please reapply for a new permit online at https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application . For questions, contact Environmental Health at 719-578-3199 option 3. MT Sequence R175671, R175683 AND R175690 | mtemple | Health Dept. | 1850972 |
CO Springs DRE | Original | D | 6/1/2023 | TBAXTER | TBAXTER | Upload signed and recorded replat (AR FP 21-00094). The architectural plans are not consistent with the development plan amendment uploaded. The amendment created a three pack product type. An minor modification to the approved development plan is necessary. TPB | | CO Springs DRE | 1850014 |
City Engr | Original | A | 6/1/2023 | PMORRIS | PMORRIS | | | City Engr | 1849845 |
Electrical | Original | D | 5/31/2023 | DANIELG | DANIELG | Footprint (site plan) showing all electrical service equipment and disconnects serving the structure (utility meter, disconnecting means, and unit panel).
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1849557 |
Electronic Plan | Original | / | 5/31/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1849556 |
CSU Waste Water | Original | A | 5/30/2023 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | CSU Waste Water | 1848917 |
CSU Water | Original | A | 5/30/2023 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | CSU Water | 1848916 |
Zoning/Planning | Original | / | 5/30/2023 | TBAXTER | TBAXTER | In Current Review by TBAXTER | | Zoning/Planning | 1848896 |
Construction | Original | D | 5/30/2023 | SHELLEY | SHELLEY | See review/progress set. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1848789 |
Enumeration | Original | D | 5/25/2023 | AMY | AMY | See progress set page 2 of the Mechanical sheets for Enumerations comments that need to be corrected. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1847529 |
Submittal 2 | Original | / | 5/24/2023 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1846929 |
CO Springs Fire | Original | D | 5/22/2023 | CSFIRE | CSFIRE | We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | dwithee | CO Springs Fire | 1845773 |
Health Dept. | Original | D | 5/17/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1844508 |
CSU Contract Admin. | Original | N | 5/16/2023 | CSUAPPSPRM | CSUAPPSPRM | All applicable development fees/charges will be collected at time of individual townhome applications. AG | aguerin | CSU Contract Admin. | 1844120 |
CO Springs DRE | Original | D | 5/15/2023 | TBAXTER | TBAXTER | Upload signed and recorded final plat. The architectural plans are not consistent with the development plan amendment. The amendment created a three pack product type. Please provide corrected information. TPB. | | CO Springs DRE | 1843547 |
Mechanical | Original | A | 5/12/2023 | TCRIPPEN | TCRIPPEN | Approved, | | Mechanical | 1842974 |
Electronic Plan | Original | / | 5/12/2023 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Electronic Plan | 1842918 |
City Engr | Original | D | 5/12/2023 | PMORRIS | PMORRIS | Upload a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (permanent water quality facility) construction plan into the building permit. | | City Engr | 1842904 |
Zoning/Planning | Original | / | 5/12/2023 | TBAXTER | TBAXTER | In Current Review by TBAXTER | | Zoning/Planning | 1842878 |
Electrical | Original | D | 5/12/2023 | DANIELG | DANIELG | Footprint (site plan) showing all electrical service equipment and disconnects serving the structure (utility meter, disconnecting means, and unit panel).
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1842790 |
Electronic Plan | Original | / | 5/12/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1842788 |
CSU Water | Original | D | 5/12/2023 | CSUREVIEW | CSUREVIEW | Requires CSU-approved and signed wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions. mjg | mgackle | CSU Water | 1842782 |
CSU Waste Water | Original | D | 5/12/2023 | CSUREVIEW | CSUREVIEW | Requires CSU-approved and signed wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan (USP). Call UDS at 719-668-8259 with questions. mjg | mgackle | CSU Waste Water | 1842781 |
Gas/Elec. Utils | Original | A | 5/12/2023 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. mjg | mgackle | Gas/Elec. Utils | 1842779 |
Construction | Original | D | 5/12/2023 | CGIECK | CGIECK | REVIEW STOPPED UPDATE TRUSS CALCS TO MATCH ROOF FRAMING PLAN
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1842770 |
Plumbing | Original | A | 5/11/2023 | SHANEN | SHANEN | | | Plumbing | 1842262 |
Electronic Plan | Original | / | 5/8/2023 | CGIECK | CGIECK | In Current Review by CGIECK | | Electronic Plan | 1840592 |
Enumeration | Original | D | 5/4/2023 | AMY | AMY | See progress set page M-2 for Enumerations comments. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1839643 |
Electronic Plan | Original | / | 5/4/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1839639 |
Fire | Original | / | 5/2/2023 | RBD GIS | RBD GIS | Parcel 7336301008 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 1838662 |
Floodplain | Original | N | 5/2/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7336301008) | | Floodplain | 1838663 |