To Be Scanned Bin (Main) | Original | / | 10/2/2024 | | SCANNING | Location = To Be Scanned Bin (Main) by SCANNING | | To Be Scanned Bin (Main) | 2067178 |
Stormwater | Original | A | 10/1/2024 | JLANDON | JLANDON | | | Stormwater | 2066611 |
Stormwater | Original | / | 9/26/2024 | | SCANNING | Location = Stormwater by SCANNING | | Stormwater | 2064946 |
CO Springs DRE | Original | A | 9/26/2024 | KSCHOTT | KSCHOTT | approval for detached garage 381 sf, 10' height (not to exceed 16' ht from existing grade per plans). All zoning and hillside requirements met. Please note that limit of disturbance boundary must be marked with 4' orange construction fencing according to approved plan; stockpiling to occur within LOD also according to approved site plan. Hillside site inspections will occur throughout construction to ensure compliance | | CO Springs DRE | 2064921 |
Submittal 4 | Original | / | 9/25/2024 | RITA | RITA | Submittal #4 | | Submittal 4 | 2064642 |
Finished Bin (Main) | Original | / | 9/11/2024 | | SCANNING | Location = Finished Bin (Main) by SCANNING | | Finished Bin (Main) | 2058448 |
Stormwater | Original | D | 9/10/2024 | JLANDON | JLANDON | needs PE Signature and stamp | | Stormwater | 2058422 |
Stormwater | Original | / | 9/5/2024 | | SCANNING | Location = Stormwater by SCANNING | | Stormwater | 2056339 |
CO Springs DRE | Original | D | 9/5/2024 | KSCHOTT | KSCHOTT | 1. for site information: show lot coverage breakdown of FFA 852 sf + exist garage 300 sf + proposed garage 381sf = 16.8% new lot coverage (do not include all impervious surfaces, only footprints) 2. Sign/date hillside certificatoin statement 3. EG (existing grade) values on site plan do not match the EG values shown on elevations. they should match 4. max height envelope on elevations should be 16', not 18' 5. PE stamp required Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 2056027 |
Submittal 3 | Original | / | 9/3/2024 | JANE | JANE | Submittal #3: MIke walking 719 243 7179 | | Submittal 3 | 2054613 |
CO Springs DRE | Original | D | 5/3/2024 | PDOSCH | PDOSCH | LOD, PAE, and temporary erosion control measures, Hillside Overlay Inspection 2, is compliant | | CO Springs DRE | 1998568 |
Finished Bin (Main) | Original | / | 3/27/2024 | | SCANNING | Location = Finished Bin (Main) by SCANNING | | Finished Bin (Main) | 1980450 |
CO Springs DRE | Original | D | 3/27/2024 | DSEXTON | DSEXTON | See comments from Kerri on 3/16/2024 | | CO Springs DRE | 1980339 |
Stormwater | Original | D | 3/26/2024 | EWANG | EWANG | Include Hillside site plan with the following: -Show and label Limits of Disturbance. -Show and label existing and proposed contours (min. 2') and label with elevations. -Show and label soil stockpile within limits of disturbance. -Show stormwater flow arrows. -Include contours, flow arrows, etc. in legend. -PE sign and stamp. If there is no change to grade, state this on the plan. | | Stormwater | 1979290 |
City Engr | Original | A | 3/21/2024 | PMORRIS | PMORRIS | Geologic hazard report on file for subdivision. Plan routed to Stormwater Enterprise | | City Engr | 1977768 |
City Engr | Original | / | 3/20/2024 | | SCANNING | Location = City Engr by SCANNING | | City Engr | 1976923 |
Plan Coordinator | Original | / | 3/19/2024 | | KSCHOTT | Location = Plan Coordinator by KSCHOTT | | Plan Coordinator | 1976609 |
CO Springs DRE | Original | D | 3/19/2024 | KSCHOTT | KSCHOTT | This property is within the Hillside Overlay therefore a hillside site plan is needed (see hard copy notes/site plan checklist) If not change to existing grade at all, please contact kerri.schott@coloradosprings.gov; LOD inspection required by contacting patrick.dosch@coloradosprings.gov
Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1976608 |
CO Springs Fire | Original | A | 3/19/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 1976286 |
Out to Review | Original | / | 3/19/2024 | CGIECK | CGIECK | | | Out to Review | 1976145 |
Construction | Original | A | 3/19/2024 | CGIECK | CGIECK | OK | | Construction | 1976144 |
Submittal 2 | Original | / | 3/19/2024 | JANE | JANE | Submittal #2 | | Submittal 2 | 1976104 |
CO Springs DRE | Original | D | 10/9/2023 | PDOSCH | PDOSCH | LOD, PAE, and temporary erosion control measures, Hillside Overlay Inspection 2, is compliant | | CO Springs DRE | 1910387 |
Stormwater | Original | D | 10/3/2023 | EWANG | EWANG | Include the following on Hillside Site Plan: 1. Limits of disturbance (LOD) 2. Existing and proposed contour lines with labels 3. Legend with contours, flow arrows, etc. 4. Stockpile within LOD 5. Stormwater flow arrows 6. PE signature and stamp | | Stormwater | 1907674 |
City Engr | Original | D | 9/29/2023 | JDAGNILLO | JDAGNILLO | EDRD has determined a waiver is required for this lot. It must be submitted directly to EDRD through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual. https://coloradosprings.gov/stormwater/planreview.
Revised application forms are available on Public Works web-page. Public Works/City Engineering Hub/New Development/Standards and References/ "References and Research Tools". https://coloradosprings.gov/public-works/page/engineering-standards-and-references
Plans routed to Stormwater Enterprise | | City Engr | 1906691 |
City Engr | Original | / | 9/29/2023 | | SCANNING | Location = City Engr by SCANNING | | City Engr | 1906410 |
Out to Review | Original | / | 9/28/2023 | | CSFIRE | Location = Out to Review by CSFIRE | rpeterson | Out to Review | 1906240 |
CO Springs Fire | Original | D | 9/28/2023 | CSFIRE | CSFIRE | Walk OK - resubmittal qualifies for walkthrough. please see link for how to request a walkthrough review from Fire: https://coloradosprings.gov/document/walk-thrumemo.pdf
We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | rpeterson | CO Springs Fire | 1906237 |
Fire | Original | / | 9/19/2023 | | SCANNING | Location = Fire by SCANNING | | Fire | 1901467 |
Plan Coordinator | Original | / | 9/19/2023 | | KSCHOTT | Location = Plan Coordinator by KSCHOTT | | Plan Coordinator | 1901375 |
CO Springs DRE | Original | D | 9/19/2023 | KSCHOTT | KSCHOTT | 1. Insufficient hillside site plan. Please see attached hillside site plan checklist or contact kerri.schott@coloradosprings.gov 2. need hillside elevations showing max allowable height of 16' or 20' from EXISTING grade lines depending on roof pitch 3. LOD inspection required by contacting patrick.dosch@coloradosprings.gov 4. approved geohazard report or waiver is required for permit approval. Contact City Engineering at Development.Review@coloradosprings.gov Informational: Please note that because this lot is within the hillside overlay; no land disturbance (including vegetation removal, excavation, grading) can occur until building permit is approved and includes an approved hillside site plan. Hillside inspections will occur throughout the permitting and construction process to ensure compliance with the hillside site plan | | CO Springs DRE | 1901374 |
Construction | Original | A | 9/12/2023 | CGIECK | CGIECK | OK | | Construction | 1898729 |
Out to Review | Original | / | 8/1/2023 | JANE | JANE | Mike 719 243 7179 | | Out to Review | 1878803 |
Construction | Original | D | 8/1/2023 | CGIECK | CGIECK | Update Codes to 2021 and ASCE 7-16 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1878781 |
Energy | Original | N | 8/1/2023 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1878753 |
Stormwater | Original | / | 8/1/2023 | SYSTEM | SYSTEM | Parcel 7336406022 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 1878752 |
Floodplain | Original | N | 8/1/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7336406022) | | Floodplain | 1878751 |