GMF Zoning | Original | D | 12/18/2024 | GMFPLANNER | GMFPLANNER | GMF Planning and Land Use approvals pending | julie.esterl@baselin | GMF Zoning | 2100244 |
Energy | Original | A | 1/24/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1955062 |
Mechanical | Original | A | 1/24/2024 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 1955061 |
Construction | Original | A | 1/24/2024 | JUSTINL | JUSTINL | 1 PLAN - 2 PERMITS. ( RESIDENCE ) ( DETACHED ACCESSORY STRUCTURE ) | | Construction | 1954882 |
Electronic Plan | Original | / | 1/24/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1954876 |
Submittal 2 | Original | / | 1/24/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 1954793 |
Plan Coordinator (Main) | Original | D | 12/27/2023 | JUSTINL | JUSTINL | Disapprove all remaining departments to allow plan to be resubmitted per Julia | | Plan Coordinator (Main) | 1944708 |
Energy | Original | D | 10/10/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1911280 |
Mechanical | Original | D | 10/10/2023 | TCRIPPEN | TCRIPPEN | See equipment certificates whole hose ventilation required, 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 1911279 |
Electrical | Original | A | 10/10/2023 | DANIELG | DANIELG | | | Electrical | 1911032 |
Electronic Plan | Original | / | 10/10/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1911018 |
Construction | Original | D | 10/9/2023 | JUSTINL | JUSTINL | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1910855 |
Electronic Plan | Original | / | 10/9/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1910702 |
Plumbing | Original | A | 10/3/2023 | SHANEN | SHANEN | | | Plumbing | 1907868 |
Floodplain | Original | N | 9/29/2023 | KEITH | KEITH | | | Floodplain | 1906721 |
Enumeration | Original | N | 9/29/2023 | BECKYA | BECKYA | | | Enumeration | 1906606 |
Energy | Original | / | 9/27/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1905206 |
Floodplain | Original | / | 9/27/2023 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 8308102004) | | Floodplain | 1905203 |