Construction | Original | A | 6/18/2024 | SHELLEY | SHELLEY | | | Construction | 2020791 |
Electrical | Original | A | 6/17/2024 | RICHG | RICHG | | | Electrical | 2020601 |
Electrical | Original | D | 5/9/2024 | RICHG | RICHG | Provide label sheet in label folder.
Show location of all new and existing electrical gear being installed. Label new or existing. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2000980 |
Electronic Plan | Original | / | 5/9/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2000971 |
Construction | Original | D | 5/8/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2000221 |
Submittal 2 | Original | / | 5/8/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2000182 |
Electrical | Original | D | 10/17/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1914826 |
Electronic Plan | Original | / | 10/17/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1914812 |
Construction | Original | D | 10/17/2023 | SHELLEY | SHELLEY | Provide racking documentation that isn't locked and allows mark-up. Provide ONLY the applicable charts for the actual system, with all applicable rows/columns indicated. OR, provide the manufacturer's configuration report. NO REVIEW. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1914800 |
Energy | Original | N | 10/10/2023 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1911576 |
Zoning | Original | N | 10/10/2023 | SYSTEM | SYSTEM | Zoning review is not required for roof-mounted PV solar projects in El Paso County. | | Zoning | 1911575 |
Floodplain | Original | N | 10/10/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5302003006) | | Floodplain | 1911549 |