Submittal 2 | Original | / | 5/23/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2008234 |
Electrical | Original | D | 5/11/2024 | SHELBY | SHELBY | 1. Please provide NRTL listing for FHP batteryand FHP aGate. 2. Feeder schedule must be on the same pageas the one line. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2002250 |
Electronic Plan | Original | / | 5/11/2024 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 2002246 |
Construction | Original | A | 5/7/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 1999516 |
Electronic Plan | Original | / | 5/7/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1999515 |
WP Zoning | Original | A | 5/3/2024 | DBURGESS | DBURGESS | Roof-mount solar - no change to zoning footprint. No ZDP required. | | WP Zoning | 1998273 |
WP Floodplain | Original | N | 5/3/2024 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 1998272 |
WP Enumeration | Original | A | 5/3/2024 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number verified | | WP Enumeration | 1998269 |
Energy | Original | N | 5/1/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 1997431 |