CO Springs Fire | Original | D | 7/11/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | rpeterson | CO Springs Fire | 2031078 |
CO Springs DRE | Original | D | 6/28/2024 | SSADLER | SSADLER | Financial assurances need to be posted prior to permit release. PLDO fees are due contact Charla at charla.hudspeth@coloradosprings.gov | | CO Springs DRE | 2026614 |
Energy | Original | D | 6/25/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2024342 |
Mechanical | Original | A | 6/25/2024 | DALEH | DALEH | | | Mechanical | 2024341 |
Electrical | Original | D | 6/25/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2024298 |
Electronic Plan | Original | / | 6/25/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2024273 |
Zoning/Planning | Original | / | 6/24/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2023450 |
CSU Contract Admin. | Original | N | 6/21/2024 | CSUAPPSPRM | CSUAPPSPRM | Applicable Development charges and fees prior to building permit issuance.
AMS | ASweet | CSU Contract Admin. | 2023419 |
Health Dept. | Original | D | 6/21/2024 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. AM | Amanda Furno | Health Dept. | 2023407 |
City Engr | Original | A | 6/21/2024 | JDAGNILLO | JDAGNILLO | | | City Engr | 2023379 |
Electronic Plan | Original | / | 6/21/2024 | DALEH | DALEH | In Current Review by DALEH | | Electronic Plan | 2023296 |
CSU Water | Original | D | 6/21/2024 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan(USP). Call UDS at 719-668-8259 with questions. mjg | mgackle | CSU Water | 2022927 |
CSU Waste Water | Original | D | 6/21/2024 | CSUREVIEW | CSUREVIEW | Requires CSU-approved wastewater and water mainline Construction Drawings (CD's) and approved Utility Service Plan(USP). Call UDS at 719-668-8259 with questions. mjg | mgackle | CSU Waste Water | 2022924 |
Gas/Elec. Utils | Original | A | 6/21/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. mjg | mgackle | Gas/Elec. Utils | 2022923 |
Construction | Original | D | 6/21/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2022845 |
Electronic Plan | Original | / | 6/21/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2022807 |
Plumbing | Original | D | 6/21/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2022793 |
Enumeration | Original | D | 6/19/2024 | BECKYA | BECKYA | This plan was not submitted under the address of the newly assigned addresses for this project. We commented during the Development Plan Major Amendment submittal to the City that the addresses for the north building is 860 Rancho Santa Fe Point and the building to the east is 841 Rancho Santa Fe Point.
See plans for further disapproval comments. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2022019 |
Electronic Plan | Original | / | 6/19/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2021904 |
Energy | Original | / | 6/19/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2021534 |
Floodplain | Original | N | 6/19/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6409402139) | | Floodplain | 2021532 |