CO Springs DRE | Original | D | 8/5/2024 | CVANAPPLEDORN | CVANAPPLEDORN | 1. Square footage and dimensions are not matching. Accurate square footage required. 2. Height of deck needed on site plan. 3. Indicate covered or uncovered on site plan. 4. Correct the last question on the deck attachment sheet. (If piers are over 3' in depth, Engineering review will be added to the overall review) (see full review) | | CO Springs DRE | 2042014 |
Zoning/Planning | Original | / | 8/5/2024 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2041950 |
Construction | Original | D | 8/5/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2041903 |
Electronic Plan | Original | / | 8/5/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2041897 |
Energy | Original | N | 7/30/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2039075 |
Floodplain | Original | N | 7/30/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6208217020) | | Floodplain | 2039073 |