Electrical | Original | A | 10/31/2024 | DANIELG | DANIELG | | | Electrical | 2079728 |
Monument Zoning | Original | A | 10/28/2024 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | bholtztom | Monument Zoning | 2078033 |
Construction | Original | A | 10/28/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2077857 |
| Original | / | 10/25/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2077390 |
| Original | / | 10/25/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2077242 |
Submittal 5 | Original | / | 10/25/2024 | BRIANNAM | BRIANNAM | Submittal #5 | | Submittal 5 | 2077240 |
Electrical | Original | D | 10/24/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2076918 |
Construction | Original | A | 10/3/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2067533 |
| Original | / | 10/2/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2067483 |
| Original | / | 10/2/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2067249 |
Submittal 4 | Original | / | 10/2/2024 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2067248 |
Electrical | Original | D | 9/20/2024 | BERTHA | BERTHA | Comply with previous review comment - Verify compliance with 110.26 NEC 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2062786 |
Electronic Plan | Original | / | 9/20/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2062758 |
Construction | Original | A | 9/19/2024 | BPHILLIPS | BPHILLIPS | Approved as noted. See plan prior to commencing construction. | | Construction | 2062143 |
Electronic Plan | Original | / | 9/19/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2062130 |
| Original | / | 9/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2060913 |
| Original | / | 9/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2060896 |
Submittal 3 | Original | / | 9/16/2024 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 2060895 |
Monument Zoning | Original | A | 9/5/2024 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | bholtztom | Monument Zoning | 2056042 |
Electrical | Original | D | 9/5/2024 | BERTHA | BERTHA | Verify compliance with 110.26 NEC 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2056002 |
Electronic Plan | Original | / | 9/5/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2055989 |
Construction | Original | D | 9/5/2024 | BPHILLIPS | BPHILLIPS | Specify type of glulam beam proposed, with exact dimensions. Verify dimensions notated on plan. Minimum pier sizes are in red text. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2055983 |
Submittal 2 | Original | / | 9/5/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2055739 |
Monument Zoning | Original | A | 9/4/2024 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | bholtztom | Monument Zoning | 2055496 |
Construction | Original | D | 8/21/2024 | BPHILLIPS | BPHILLIPS | Projects proposed to be constructed out of steel must bear the stamp, date and signature of a Colorado-licensed design professional (e.g. architect, engineer). 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2049555 |
Electronic Plan | Original | / | 8/21/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2049542 |
Energy | Original | N | 8/14/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2046360 |
Floodplain | Original | N | 8/14/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7125407015) | | Floodplain | 2046359 |