Energy | Original | D | 10/25/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2077527 |
Electrical | Original | A | 10/25/2024 | RICHG | RICHG | | | Electrical | 2077526 |
Electronic Plan | Original | / | 10/25/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2077523 |
Woodmoor Water | Original | D | 10/23/2024 | WOODWATER | WOODWATER | 1. The applicant must fill out a Modified Tap Permit and pay all associated fees prior to plan approval. 2.Additional comments have been made on the reviewed progress plan. Please see all WWSD comments on the Plumbing Plans for required revisions. | wwsdengineer | Woodmoor Water | 2076470 |
County Zoning | Original | D | 10/18/2024 | DSDARCHULETA | DSDARCHULETA | DISAPPROVED: ALQ AFFIDAVIT REQUIRED SEE ATTACHED FORM
Must complete the Accessory Living Quarters affidavit. (1) Affidavit must be signed by all property owners and notarized. (2) Signed and notarized affidavit must be recorded with the El Paso County Clerk and Recorder. (3) Obtain a recorded (stamped) copy of the affidavit from the El Paso County Clerk and Recorder. (4) Upload and submit the following with the plan set through the PPRBD web site:
*** Do not email the ALQ Affidavit directly to Dennis. It must be part of the PPRBD plan resubmission. ***
Call if you have any questions (719)520-6937 | | County Zoning | 2074618 |
Mechanical | Original | D | 10/18/2024 | TREVORH | TREVORH | Disapproved; 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2074477 |
Zoning/Planning | Original | / | 10/18/2024 | DSDARCHULETA | DSDARCHULETA | In Current Review by DSDARCHULETA | | Zoning/Planning | 2074468 |
Plumbing | Original | D | 10/17/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2074059 |
Construction | Original | D | 10/17/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2074034 |
Submittal 2 | Original | / | 10/17/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2073794 |
Woodmoor Water | Original | D | 9/9/2024 | WOODWATER | WOODWATER | 1. Please include sewer cleanouts and wye connections where indicated on the plumbing plans. 2. Please resubmit the plumbing plans that indicate existing location of the water service line entering the existing building and how the addition will connect to the existing building's water system (see plan markups for additional information). 3. Please indicate all sizes and materials for existing and proposed water and sanitary services. 4. A modified tap permit for the sewer service connection must be filled out with the associated permit fees paid prior to plan approval. | wwsdengineer | Woodmoor Water | 2057280 |
Energy | Original | D | 9/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2055971 |
Electrical | Original | D | 9/5/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2055970 |
Electronic Plan | Original | / | 9/5/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2055961 |
Mechanical | Original | D | 9/5/2024 | TREVORH | TREVORH | Disapproved; Need to see construction review comments addressed. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2055794 |
County Zoning | Original | D | 9/4/2024 | DSDARCHULETA | DSDARCHULETA | DISAPPROVED: (1) MUST SHOW THE DISTANCE MEASUREMENT OF PROPERTY LINE TO STRUCTURE (2) MUST PROVIDED COMPLETED ALQ AFFIDAVIT (SIGNED, NOTARIZED, RECORDED)
NOTES: BOA243 APPROVAL FOR 20' FRONT SETBACK AND ADDITION. ALSO INCLUDES ACC APPROVAL FOR ADDITION | | County Zoning | 2055424 |
County Zoning | Original | D | 9/4/2024 | DSDYOUNGER | DSDYOUNGER | 1.) Provide Woodmoor ACC letter of approval 2.) Accessory Living Quarters Affidavit is required. It must be signed (by both property owners) notarized and recorded with the Clerk and Recorder. Obtain a recorded copy to upload to plan set prior to re-submitting.
**Affidavit has been uploaded as an "other" document for your convenience** | | County Zoning | 2055339 |
Zoning/Planning | Original | / | 9/4/2024 | DSDYOUNGER | DSDYOUNGER | In Current Review by DSDYOUNGER | | Zoning/Planning | 2055331 |
Construction | Original | D | 9/4/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2055325 |
Electronic Plan | Original | / | 9/4/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2055267 |
Plumbing | Original | D | 8/28/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2052771 |
Energy | Original | / | 8/28/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2052534 |
Water Division | Original | / | 8/28/2024 | SYSTEM | SYSTEM | Parcel 7112305003 is within WOODMOOR WATER & SANITATION. Water Review is required for Addition and Detached structures. | | Water Division | 2052532 |
Floodplain | Original | N | 8/28/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7112305003) | | Floodplain | 2052533 |