CO Springs DRE | Original | A | 2/28/2025 | CHUDSPETH | CHUDSPETH | Financial Assurance in place. | | CO Springs DRE | 2126018 |
CO Springs DRE | Original | D | 1/28/2025 | CHUDSPETH | CHUDSPETH | Plans have been denied until planner review is complete. All PLDO, School, CDI fees were paid on 1/28/2025. Waiting on FA's | | CO Springs DRE | 2114554 |
CO Springs DRE | Original | D | 1/28/2025 | SSADLER | SSADLER | Previous comments still not addressed. All private financial assurances must be posted and all other fees paid prior to permit release. On the next submittal a $180.00 re review fee will be charged for the forth review. Plans are stamped and will be approved and released once the assurances and the fees are paid. All required documents have been uploaded. | | CO Springs DRE | 2114233 |
Zoning/Planning | Original | / | 1/24/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2112295 |
Energy | Original | A | 1/24/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2112200 |
Construction | Original | A | 1/24/2025 | BPHILLIPS | BPHILLIPS | | | Construction | 2112199 |
Electronic Plan | Original | / | 1/23/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2111872 |
Enumeration | Original | A | 1/23/2025 | BECKYA | BECKYA | | | Enumeration | 2111765 |
| Original | / | 1/23/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2111671 |
| Original | / | 1/23/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2111573 |
Submittal 3 | Original | / | 1/23/2025 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 2111572 |
CO Springs DRE | Original | D | 12/13/2024 | SSADLER | SSADLER | Previous comments not addressed. Private financial assurances must be posted. School and park fees must be paid. The 13th page of the development plan needs to be uploaded. | | CO Springs DRE | 2098566 |
City Engr | Original | A | 12/13/2024 | JDAGNILLO | JDAGNILLO | | | City Engr | 2098440 |
Energy | Original | D | 12/11/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2097637 |
Mechanical | Original | A | 12/11/2024 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2097636 |
Zoning/Planning | Original | / | 12/11/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2097604 |
Construction | Original | D | 12/11/2024 | BPHILLIPS | BPHILLIPS | Show required accessibility features. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2097603 |
Electronic Plan | Original | / | 12/11/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2097518 |
Enumeration | Original | A | 12/9/2024 | BECKYA | BECKYA | 1 PLAN 4 PERMITS | | Enumeration | 2096600 |
Submittal 2 | Original | / | 12/9/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2096541 |
CO Springs Fire | Original | A | 11/19/2024 | CSFIRE | CSFIRE | Fee entered is per Unit so there will be four total fees collected this bldg.
Site Safety Plan per IFC 3301.1 required within 45 days of permit issuance.
You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | phil.valdez | CO Springs Fire | 2086963 |
Energy | Original | D | 11/15/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2085976 |
Electrical | Original | A | 11/15/2024 | DANIELG | DANIELG | | | Electrical | 2085975 |
CO Springs DRE | Original | D | 11/12/2024 | SSADLER | SSADLER | All private assurances must be posted prior to building permit release. Upload the final approved landscaping and irrigation plans. School and park fees are due prior to building permit release. Please contact Charla Hudspeth at charla.hudspeth@coloradosprings.gov | | CO Springs DRE | 2084098 |
City Engr | Original | D | 11/8/2024 | JDAGNILLO | JDAGNILLO | Include a copy of the Stormwater Enterprise approved Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. | | City Engr | 2083117 |
EPC Health Dept | Original | N | 11/8/2024 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1556 is valid from 11/11/2024 - 5/11/2025. To continue any earthmoving operations after 5/11/2025, please reapply for a new permit online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. KB | KBauer | EPC Health Dept | 2083015 |
CSU Contract Admin. | Original | N | 11/7/2024 | CSUAPPSPRM | CSUAPPSPRM | Applicable Development Utility charges and fees due prior to building permit. - AMS | ASweet | CSU Contract Admin. | 2082613 |
Plumbing | Original | A | 11/7/2024 | SHANEN | SHANEN | | | Plumbing | 2082607 |
Mechanical | Original | D | 11/7/2024 | TCRIPPEN | TCRIPPEN | Disapproved: 16 Seer required condenser 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2082582 |
CSU Water | Original | A | 11/6/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings DATED 1/18/24 provided with permit set.MDA | malcuran | CSU Water | 2082558 |
CSU Waste Water | Original | A | 11/6/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings DATED 1/18/24 provided with permit set.MDA | malcuran | CSU Waste Water | 2082557 |
Gas/Elec. Utils | Original | A | 11/6/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.MDA | malcuran | Gas/Elec. Utils | 2082556 |
Zoning/Planning | Original | / | 11/6/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2082377 |
Construction | Original | D | 11/6/2024 | BPHILLIPS | BPHILLIPS | Indicate fire separation distances on architectural site plan. Show accessibility compliance where noted. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2082368 |
Electronic Plan | Original | / | 10/31/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2079834 |
Enumeration | Original | A | 10/28/2024 | AMY | AMY | | | Enumeration | 2078424 |
Electronic Plan | Original | / | 10/28/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2078360 |
Energy | Original | / | 10/28/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2078313 |
Floodplain | Original | N | 10/28/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5306306048) | | Floodplain | 2078311 |