Required Departments: 5
|
|
|
Log Entries: 6
|
|
Construction | Original | D | 10/30/2024 | CHRISTINEH | CHRISTINEH | Snow loads need to be 40 psf / 57 psg / Rest ok 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2079534 | Energy | Original | N | 10/30/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2079533 | Electrical | Original | A | 10/30/2024 | DANIELG | DANIELG | | | Electrical | 2079480 | Out to Review | Original | / | 10/30/2024 | JACKIEP | JACKIEP | CALVIN WORKING | | Out to Review | 2079424 | Energy | Original | / | 10/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2079423 | Floodplain | Original | N | 10/30/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7110006011) | | Floodplain | 2079422 |
|
| |
|