Energy | Original | D | 12/12/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2098157 |
Electrical | Original | A | 12/12/2024 | DANIELG | DANIELG | | | Electrical | 2098156 |
Mechanical | Original | A | 12/4/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2094138 |
CO Springs DRE | Original | D | 12/2/2024 | KSCHOTT | KSCHOTT | 1. Provide an individual site plan showing property boundaries, distances to property lines, structure dimensions, utility easements, etc. 2. Elevation drawings in the architectural drawings do not appear to match the approved DP elevation drawings 3. CDI and PLDO fees are due prior to permit approvals. contact charla.hudspeth@coloradosprings.gov 4. both public and private financial assurances must be posted prior to permit approval. For public, contact City Public Works and for private contact patrick.dosch@coloradosprings.gov 5. Per the approval letter for the DP; DP only included preliminary landscape plan. Must have FINAL landscape and FINAL irrigation plan reviewed/approved by Land Use Review and uploaded with permit. If haven't had final plans reviewed for landscape please contact gregory.stachon@coloradosprings.gov kerri.schott@coloradosprings.gov | | CO Springs DRE | 2092968 |
Zoning/Planning | Original | / | 11/27/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2090407 |
City Engr | Original | D | 11/26/2024 | JDAGNILLO | JDAGNILLO | Include a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. | | City Engr | 2090323 |
Construction | Original | D | 11/26/2024 | JUSTINL | JUSTINL | fire separation and rated wall deficiencies * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2090102 |
Electronic Plan | Original | / | 11/26/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2089934 |
Plumbing | Original | D | 11/25/2024 | SHANEN | SHANEN | Show the water meter location on the plumbing plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2089360 |
Enumeration | Original | D | 11/21/2024 | AMY | AMY | Email to Scott requesting to show the side set backs from single family attached structure to single family attached structure. On the list of addressing for the plan label, correct lot 92 address. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2088351 |
Electronic Plan | Original | / | 11/21/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2088283 |
Floodplain | Original | N | 11/20/2024 | KEITH | KEITH | | | Floodplain | 2088066 |
Energy | Original | / | 11/20/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2087787 |