Required Departments: 5
|
|
|
Log Entries: 7
|
|
Mechanical | Original | A | 12/11/2024 | DALEH | DALEH | | | Mechanical | 2097350 | Construction | Original | A | 12/10/2024 | CHRISTINEH | CHRISTINEH | | | Construction | 2096897 | Energy | Original | N | 12/10/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2096889 | Electronic Plan | Original | / | 12/10/2024 | CHRISTINEH | CHRISTINEH | In Current Review by CHRISTINEH | | Electronic Plan | 2096865 | Energy | Original | / | 12/6/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2095490 | Health Dept. | Original | / | 12/6/2024 | SYSTEM | SYSTEM | Health dept review is required for a residential addition, basement finish, or interior remodel for properties that have a septic system. Contact HEASepticinfo@elpasoco.com for additional information. | | Health Dept. | 2095488 | Floodplain | Original | N | 12/6/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6201005008) | | Floodplain | 2095489 |
|
| |
|