Electrical | Original | A | 2/4/2025 | RICHG | RICHG | | | Electrical | 2116844 |
Electronic Plan | Original | / | 2/4/2025 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2116834 |
CO Springs DRE | Original | D | 1/30/2025 | CVANAPPLEDORN | CVANAPPLEDORN | The site plan is required to have the property lines shown in reference to the primary structure. This does NOT require any survey to be done. If the utility boxes will be 5' or closer to the side property line, please show the distance between on the site plan as well. | | CO Springs DRE | 2115374 |
Zoning/Planning | Original | / | 1/30/2025 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2115369 |
Construction | Original | A | 1/30/2025 | BPHILLIPS | BPHILLIPS | | | Construction | 2115332 |
Electronic Plan | Original | / | 1/30/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2115318 |
Energy | Original | N | 1/28/2025 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2114530 |
Zoning | Original | / | 1/28/2025 | SYSTEM | SYSTEM | Colorado Springs requires a zoning review for roof-mounted PV solar projects. | | Zoning | 2114529 |
Floodplain | Original | N | 1/28/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6216210043) | | Floodplain | 2114528 |