| CO Springs Fire | Splice 08/15/25 | N | 8/18/2025 | CSFIRE | CSFIRE | Not in WUI
No Fire Final or Fire Review | phil.valdez | CO Springs Fire | 2198534 |
| Construction | Splice 08/15/25 | A | 8/15/2025 | SHELLEY | SHELLEY | Revised roof loading | | Construction | 2198298 |
| City Engr | Original | A | 7/25/2025 | JDAGNILLO | JDAGNILLO | | | City Engr | 2189541 |
| | Original | / | 7/23/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2188573 |
| | Original | / | 7/23/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2188281 |
| Submittal 4 | Original | / | 7/23/2025 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2188280 |
| CO Springs DRE | Original | A | 7/10/2025 | SSADLER | SSADLER | “By approving this permit, the applicant accepts the hillside disclaimer statement; no grading or vegetation removal”. All code requirements are met and the new single-family permit is approved. This approval does not allow the addition of a second dwelling unit to be rented or function separately from the primary unit or approve any easement encroachments. Architectural features encroaching into setback shall adhere to Chapter 7.4.203 of the Unified Development Code
This permit must schedule the LOD inspection prior to starting work. Call Stef at 719-385-2234 to schedule | | CO Springs DRE | 2182503 |
| Energy | Original | A | 7/3/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2180357 |
| Mechanical | Original | A | 7/3/2025 | TREVORH | TREVORH | Approved; | | Mechanical | 2180356 |
| Zoning/Planning | Original | / | 7/3/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2180249 |
| City Engr | Original | D | 7/3/2025 | HVO | HVO | Geo-hazard is under review. Please upload the approved geo-report once it gets approved. | | City Engr | 2180080 |
| Enumeration | Original | A | 7/3/2025 | BRENT | BRENT | | | Enumeration | 2180053 |
| Electronic Plan | Original | / | 7/3/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2180043 |
| | Original | / | 7/3/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2180026 |
| | Original | / | 7/2/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2179666 |
| Submittal 3 | Original | / | 7/2/2025 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2179665 |
| CO Springs DRE | Original | D | 6/30/2025 | SSADLER | SSADLER | Sign and date the hillside disclaimer on both of the site plans. All other dimensional standards and hillside requirements have been met. | | CO Springs DRE | 2178536 |
| City Engr | Original | D | 6/26/2025 | JDAGNILLO | JDAGNILLO | Geological hazard report has been submitted in Project Dox (#STM-REV25-0598) and will be reviewed by CGS and the City. All technical comments on the report will be communicated directly in Project Dox.
Once report gets approved, please upload it with the building permit plan set. | | City Engr | 2177135 |
| Energy | Original | D | 6/26/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2176915 |
| Mechanical | Original | D | 6/26/2025 | TREVORH | TREVORH | Disapproved; NO action taken from previous Review comments * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2176914 |
| Zoning/Planning | Original | / | 6/25/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2176291 |
| Construction | Original | A | 6/25/2025 | SHELLEY | SHELLEY | | | Construction | 2176253 |
| Enumeration | Original | A | 6/25/2025 | BRENT | BRENT | | | Enumeration | 2176243 |
| Electronic Plan | Original | / | 6/25/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2176235 |
| Submittal 2 | Original | / | 6/25/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2176161 |
| CO Springs DRE | Original | D | 6/23/2025 | SSADLER | SSADLER | On the site plan clearly label the front and side setbacks. | | CO Springs DRE | 2174980 |
| Stormwater | Original | A | 6/20/2025 | JLANDON | JLANDON | | | Stormwater | 2174228 |
| Energy | Original | D | 6/17/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2173037 |
| Mechanical | Original | D | 6/17/2025 | TREVORH | TREVORH | Disapproved; Need to show size and location of the dampered outside air termination. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2173036 |
| Zoning/Planning | Original | / | 6/17/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2172964 |
| Electrical | Original | A | 6/17/2025 | DANIELG | DANIELG | | | Electrical | 2172945 |
| City Engr | Original | D | 6/17/2025 | HVO | HVO | EDRD has determined geological hazards exist in this area and requires a full geo-hazard report. Please submit it to EDRD through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual. https://coloradosprings.gov/stormwater/planreview
Once the report gets approved, please upload it with the building permit set. | | City Engr | 2172531 |
| Plumbing | Original | A | 6/17/2025 | SHANEN | SHANEN | | | Plumbing | 2172424 |
| Construction | Original | D | 6/17/2025 | SHELLEY | SHELLEY | Clarify access to Dining Room. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2172353 |
| Energy | Original | / | 6/17/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2172344 |
| Electronic Plan | Original | / | 6/16/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2172244 |
| Enumeration | Original | A | 6/13/2025 | BRENT | BRENT | | | Enumeration | 2171604 |
| Electronic Plan | Original | / | 6/13/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2171594 |
| Energy | Original | / | 6/12/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2171040 |
| Stormwater | Original | / | 6/12/2025 | SYSTEM | SYSTEM | Parcel 6307210011 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2171038 |
| Floodplain | Original | N | 6/12/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6307210011) | | Floodplain | 2171039 |