| Energy | Original | D | 12/29/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2251663 |
| Mechanical | Original | D | 12/29/2025 | TREVORH | TREVORH | Disapproved; Need to see construction review comments addressed. missing stamp on documents to be a true Engineered system. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2251662 |
| CO Springs Fire | Original | D | 12/26/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | CO Springs Fire | 2251382 |
| Stormwater | Original | D | 12/23/2025 | JLANDON | JLANDON | Upload full approved Development Plan and approved final phase Grading and Erosion Control Plan | | Stormwater | 2251047 |
| Electronic Plan | Original | / | 12/23/2025 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Electronic Plan | 2250965 |
| Electrical | Original | D | 12/22/2025 | CONNERM | CONNERM | See one line
Show interior and exterior lighting controls, when required by unamended 2021 IECC R404.2 and R404.3
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2250644 |
| City Engr | Original | D | 12/19/2025 | JDAGNILLO | JDAGNILLO | Include a copy of the approved Development Plan and a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set.
Please submit financial assurances for all public street improvements along W. Colorado Ave. These must be posted prior to building permit issuance by City Engineering. In addition, public street construction plans must be submitted separately to Engineering Development Review and Traffic Engineering and reviewed/approved prior to beginning of construction of all public right-of-way improvements. Thank you. | | City Engr | 2250505 |
| CO Springs DRE | Original | D | 12/19/2025 | SSADLER | SSADLER | Upload the final approved and stamped development plan. Upload the approval letter. Upload the final recorded plat. Upload the final approved landscaping and irrigation plans. Assurances for all private improvements must be posted prior to building permit issuance. PLDO/CDI fees must be paid prior to building permit issuance. Contact Charla at charla.hudspeth@coloradosprings.gov | | CO Springs DRE | 2250407 |
| EPC Health Dept | Original | N | 12/19/2025 | HEALTHDEPT | HEALTHDEPT | Not applicable. KB. | KBauer | EPC Health Dept | 2250378 |
| Electronic Plan | Original | / | 12/19/2025 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2250339 |
| Zoning/Planning | Original | / | 12/19/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2250331 |
| CSU Water | Original | D | 12/19/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. MLW | mlwilliams | CSU Water | 2250316 |
| CSU Waste Water | Original | D | 12/19/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. MLW | mlwilliams | CSU Waste Water | 2250314 |
| Gas/Elec. Utils | Original | D | 12/19/2025 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. MLW | mlwilliams | Gas/Elec. Utils | 2250313 |
| CSU Contract Admin. | Original | N | 12/19/2025 | CSUAPPSPRM | CSUAPPSPRM | Applicable Development Utility charges and fees due prior to building permit. - AMS | ASweet | CSU Contract Admin. | 2250295 |
| Construction | Original | D | 12/19/2025 | BRIANB | BRIANB | accessibility / missing pre-manufactured floor and roof truss design / exterior rated wall assemblies - projections * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2250283 |
| Plumbing | Original | D | 12/12/2025 | SHANEN | SHANEN | Provide plumbing plans that comply with PPRBD requirements for residential plumbing plans. See link: https://www.pprbd.org/File/ByAlias/ResPlumbing * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2247005 |
| Energy | Original | / | 11/24/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2240817 |
| Electronic Plan | Original | / | 11/24/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2240814 |
| Enumeration | Original | A | 11/24/2025 | AMY | AMY | This area is not replatting. | | Enumeration | 2240438 |
| Electronic Plan | Original | / | 11/24/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2240414 |
| Submittal 2 | Original | / | 11/24/2025 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2240330 |
| Plan Coordinator (Main) | Original | D | 11/12/2025 | BRIANB | BRIANB | Disapprove all remaining departments to allow plan to be resubmitted / Preliminary review only. This proposed design includes a 4th story and therefore does not meet the requirements for a townhouse to be reviewed under the 2021 IRC. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plan Coordinator (Main) | 2235698 |
| Electronic Plan | Original | / | 11/10/2025 | BRIANB | BRIANB | In Current Review by BRIANB | | Electronic Plan | 2234709 |
| Enumeration | Original | D | 11/7/2025 | AMY | AMY | 1. On Page G3.0, the area of work for this plan was clouded for you. This is required, please do so in the future. 2. Final Plat pending: a. Enumerations will review the pre-plat (mylar) prior to plat for address placement, street names, and title block.
b. A $10.00 per lot and tract platting fee will be due at the time of the review of the pre-plat, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. As of December 5th 2023, the fee for all credit/debit cards has changed from the flat 2.95% fee to the following: Over the phone Credit/Debit Card payments will be 2.3% and In-Person Debit Card payments will be 1.5% (in-person only). Paid directly to the Enumerations Department.
c. Pre-plat reviews can be reviewed via “pdf” or in-person. The pre-plat will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations stamping the pre-plat and receiving payment of plat fees. If any pre-plat changes occur, even if changes do not apply to Enumerations, we still need to re-stamp the pre-plat. The Enumerations stamped pre-plat copy should match the recorded document minus a few signatures. If you would like an in-person review, please make an appointment on our website, https://www.pprbd.org/Home/BookAppt
d. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Please email the Enumerations staff member that reviewed your project. Amy@pprbd.org; Brent@pprbd.org; or BeckyA@pprbd.org * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2234221 |
| Electronic Plan | Original | / | 11/7/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2234168 |
| | Original | / | 11/6/2025 | SYSTEM | SYSTEM | Plan Review fees paid 11/06/2025 for plan submitted 10/27/2025. Submit Date updated to now. Plan now open for review. | | | 2234131 |
| Energy | Original | / | 10/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2229075 |
| Floodplain | Original | N | 10/27/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7411229019) | | Floodplain | 2229074 |
| Stormwater | Original | / | 10/27/2025 | SYSTEM | SYSTEM | Parcel 7411229019 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2229073 |