| Energy | Original | D | 2/4/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2263292 |
| Mechanical | Original | D | 2/4/2026 | TCRIPPEN | TCRIPPEN | Disapproved provide Grill manufactures manual, And grill to roof distance what is ceiling made of * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2263291 |
| City Engr | Original | A | 2/3/2026 | HVO | HVO | EDRD has no additional comments. | | City Engr | 2262860 |
| CO Springs DRE | Original | A | 2/3/2026 | SSADLER | SSADLER | Previous approval comments still apply. | | CO Springs DRE | 2262815 |
| Zoning/Planning | Original | / | 2/3/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2262533 |
| Plumbing | Original | A | 2/2/2026 | SHANEN | SHANEN | | | Plumbing | 2262412 |
| Electrical | Original | A | 2/2/2026 | CONNERM | CONNERM | | | Electrical | 2262401 |
| Electronic Plan | Original | / | 2/2/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2262400 |
| Construction | Original | A | 2/2/2026 | SHELLEY | SHELLEY | No outdoor cooking appliance shown. | | Construction | 2262388 |
| Energy | Original | / | 2/2/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2262387 |
| Submittal 2 | Original | / | 1/30/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2261737 |
| CO Springs Fire | Original | D | 11/20/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | michael.davis1@color | CO Springs Fire | 2239198 |
| CO Springs Fire | Original | / | 11/20/2025 | CSFIRE | CSFIRE | | michael.davis1@color | CO Springs Fire | 2239194 |
| CO Springs Fire | Original | D | 11/20/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | michael.davis1@color | CO Springs Fire | 2239180 |
| CO Springs DRE | Original | A | 11/17/2025 | SSADLER | SSADLER | Proposed additions are approved. All site dimensional standards are met. New lot coverage is 11.5% | | CO Springs DRE | 2237110 |
| City Engr | Original | D | 11/13/2025 | HVO | HVO | EDRD has determined geological hazards exist in this area and will accept a Geologic Hazard Report to be required for this site. Please submit it to EDRD through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual. https://coloradosprings.gov/stormwater/planreview
Once it has been approved, please upload the approved file with the building permit set. | | City Engr | 2236397 |
| Energy | Original | D | 11/13/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2236203 |
| Mechanical | Original | A | 11/13/2025 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2236202 |
| Zoning/Planning | Original | / | 11/12/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2235459 |
| Electrical | Original | A | 11/11/2025 | CONNERM | CONNERM | | | Electrical | 2235201 |
| Plumbing | Original | A | 11/11/2025 | SHANEN | SHANEN | | | Plumbing | 2235197 |
| Construction | Original | D | 11/11/2025 | SHELLEY | SHELLEY | See architectural plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2235161 |
| Electronic Plan | Original | / | 11/11/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2235154 |
| | Original | / | 10/31/2025 | SYSTEM | SYSTEM | Plan Review fees paid 10/31/2025 for plan submitted 10/31/2025. Submit Date updated to now. Plan now open for review. | | | 2231485 |
| Energy | Original | / | 10/31/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2231471 |
| Fire | Original | / | 10/31/2025 | RBD GIS | RBD GIS | Parcel 7326301024 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 2231469 |
| Floodplain | Original | N | 10/31/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7326301024) | | Floodplain | 2231470 |