| | Original | / | 2/10/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2265133 |
| | Original | / | 2/10/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2265110 |
| Submittal 3 | Original | / | 2/10/2026 | MELISSAF | MELISSAF | Submittal #3 | | Submittal 3 | 2265109 |
| CO Springs DRE | Original | D | 2/3/2026 | SSADLER | SSADLER | Previous comments not addressed. Show the height of the proposed structure measured from the average finished grade to peak of roof. PLDO/CDI are due prior to building permit issuance. Contact Charla at charla.hudspeth@coloradosprings.gov | | CO Springs DRE | 2262684 |
| City Engr | Original | D | 2/2/2026 | JDAGNILLO | JDAGNILLO | Geological hazard report has been submitted in Project Dox (#STM-REV26-0025) and is currently being reviewed by CGS and the City. CGS comments are due back 2-17-26 and will be communicated directly in Project Dox. Once report is signed by the City, please upload a copy into this electronic building permit file. | | City Engr | 2262088 |
| Stormwater | Original | A | 1/30/2026 | JLANDON | JLANDON | | | Stormwater | 2261764 |
| Zoning/Planning | Original | / | 1/29/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2261294 |
| Energy | Original | D | 1/29/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2261291 |
| Electrical | Original | A | 1/29/2026 | CONNERM | CONNERM | | | Electrical | 2261290 |
| Electronic Plan | Original | / | 1/29/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2261289 |
| Construction | Original | D | 1/29/2026 | SHELLEY | SHELLEY | Still need clarification on covered patio roof and framing. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2261287 |
| Enumeration | Original | A | 1/26/2026 | BRENT | BRENT | | | Enumeration | 2259992 |
| Electronic Plan | Original | / | 1/26/2026 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2259984 |
| Submittal 2 | Original | / | 1/26/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2259972 |
| CO Springs DRE | Original | D | 1/16/2026 | SSADLER | SSADLER | On the site plans the hillside disclaimer must be signed and dated. In the site data identify how many garage doors there are. Label the stockpile areas on the site plans. Contact Charla at charla.hudspeth@coloradosprings.gov to discuss if there are any CDI fees owed. | | CO Springs DRE | 2257352 |
| Stormwater | Original | D | 1/15/2026 | JLANDON | JLANDON | include on hillside plan: -Show and label soil stockpile within limits of disturbance. -PE sign and stamp. | | Stormwater | 2256866 |
| Zoning/Planning | Original | / | 1/13/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2255553 |
| Energy | Original | D | 1/12/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2255281 |
| Mechanical | Original | A | 1/12/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2255280 |
| City Engr | Original | D | 1/12/2026 | JDAGNILLO | JDAGNILLO | Please submit the geological hazard report included in this building permit plan set to Engineering Development Review via our Project Dox plan submittal system. It can be accessed via the following link:
https://coloradosprings-co-us.avolvecloud.com/ | | City Engr | 2255273 |
| Electrical | Original | D | 1/12/2026 | CONNERM | CONNERM | Show location of electrical emergency disconnect and electrical panel location
Provide generic fixture schedule * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2255208 |
| Electronic Plan | Original | / | 1/12/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2255194 |
| Construction | Original | D | 1/12/2026 | SHELLEY | SHELLEY | Patio roof and roof framing * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2255192 |
| Electronic Plan | Original | / | 1/12/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2255141 |
| Plumbing | Original | A | 1/7/2026 | SHANEN | SHANEN | | | Plumbing | 2254170 |
| Electrical | Original | / | 1/2/2026 | WEBSITE | WEBSITE | Overtime Authorized for Electrical by Geraldine Diethelm | gery2812 | Electrical | 2252890 |
| Construction | Original | / | 1/2/2026 | WEBSITE | WEBSITE | Overtime Authorized for Construction by Geraldine Diethelm | gery2812 | Construction | 2252889 |
| Enumeration | Original | A | 12/22/2025 | BRENT | BRENT | | | Enumeration | 2250739 |
| Electronic Plan | Original | / | 12/22/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2250733 |
| | Original | / | 12/22/2025 | SYSTEM | SYSTEM | Plan Review fees paid 12/22/2025 for plan submitted 12/22/2025. Submit Date updated to now. Plan now open for review. | | | 2250677 |
| Energy | Original | / | 12/22/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2250620 |
| Stormwater | Original | / | 12/22/2025 | SYSTEM | SYSTEM | Parcel 6307208026 is within the Hillside Overlay (HS). Stormwater Review is required. | | Stormwater | 2250618 |
| Floodplain | Original | N | 12/22/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6307208026) | | Floodplain | 2250619 |