| CO Springs DRE | Original | A | 4/13/2026 | CHUDSPETH | CHUDSPETH | No PLDO, School or CDI fees are due. | | CO Springs DRE | 2292229 |
| CO Springs DRE | Original | D | 4/8/2026 | SSADLER | SSADLER | Previous comments not addressed. Fees may be due for the ADU. Contact Charla at charla.hudspeth@coloradosprings.gov A public notice poster will need to be paid for and picked up the PPRBD building at 2880 International Circle. Zoning is on the 2nd floor | | CO Springs DRE | 2290300 |
| Zoning/Planning | Original | / | 4/8/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2290229 |
| | Original | / | 4/3/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2288888 |
| | Original | / | 4/3/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2288776 |
| Submittal 3 | Original | / | 4/3/2026 | MELISSAF | MELISSAF | Submittal #3 | | Submittal 3 | 2288775 |
| City Engr | Original | A | 3/26/2026 | JDAGNILLO | JDAGNILLO | | | City Engr | 2285005 |
| CO Springs DRE | Original | D | 3/25/2026 | SSADLER | SSADLER | Upload the required ADU affidavits. They can be found on the city's website. Fees may be due for the ADU. Contact Charla at charla.hudspeth@coloradosprings.gov A public notice poster will need to be paid for and picked up the PPRBD building at 2880 International Circle. Zoning is on the 2nd floor | | CO Springs DRE | 2284187 |
| Zoning/Planning | Original | / | 3/24/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2283556 |
| Energy | Original | A | 3/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2283438 |
| Plumbing | Original | A | 3/23/2026 | SHANEN | SHANEN | | | Plumbing | 2283437 |
| Electrical | Original | A | 3/23/2026 | CONNERM | CONNERM | | | Electrical | 2283404 |
| Electronic Plan | Original | / | 3/23/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2283400 |
| Construction | Original | A | 3/23/2026 | JUSTINL | JUSTINL | | | Construction | 2283390 |
| Electronic Plan | Original | / | 3/23/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2283389 |
| Enumeration | Original | A | 3/23/2026 | BECKYA | BECKYA | | | Enumeration | 2283022 |
| Submittal 2 | Original | / | 3/20/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2282934 |
| CO Springs DRE | Original | D | 2/12/2026 | SSADLER | SSADLER | Due to changes to the ADU code, a maximum height of any structure containing an ADU is now 16ft. Please schedule a new pre application meeting to discuss the current ADU dimensional standards. | | CO Springs DRE | 2266150 |
| City Engr | Original | D | 2/12/2026 | JDAGNILLO | JDAGNILLO | Engineering Development Review has determined a geological hazard waiver will be required for this lot. It must be submitted directly to EDRD through our electronic review system called ProjectDox. Below is a link to ProjectDox and a user manual.
https://coloradosprings.gov/stormwater/planreview
Revised application forms are available on Public Works web-page. Public Works/City Engineering Hub/New Development/Standards and References/ "References and Research Tools". https://coloradosprings.gov/public-works/page/engineering-standards-and-references | | City Engr | 2266019 |
| Energy | Original | D | 2/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2265761 |
| Mechanical | Original | A | 2/11/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2265760 |
| Zoning/Planning | Original | / | 2/10/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2265028 |
| Electrical | Original | D | 2/10/2026 | CONNERM | CONNERM | Show compliance with 2021 IECC R404.3 * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2264978 |
| Electronic Plan | Original | / | 2/10/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2264968 |
| Construction | Original | D | 2/10/2026 | JUSTINL | JUSTINL | See architectural, structural and site plan documents for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2264964 |
| Electronic Plan | Original | / | 2/10/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2264937 |
| Plumbing | Original | A | 1/20/2026 | SHANEN | SHANEN | | | Plumbing | 2257812 |
| Enumeration | Original | A | 1/20/2026 | BECKYA | BECKYA | | | Enumeration | 2257581 |
| Electronic Plan | Original | / | 1/20/2026 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2257578 |
| | Original | / | 1/16/2026 | SYSTEM | SYSTEM | Plan Review fees paid 01/16/2026 for plan submitted 01/16/2026. Submit Date updated to now. Plan now open for review. | | | 2257407 |
| Energy | Original | / | 1/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2257131 |
| Floodplain | Original | N | 1/16/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6407423050) | | Floodplain | 2257129 |