| Out to Review | Original | / | 6/23/2026 | TCRIPPEN | TCRIPPEN | PLAN OUT TO REVIEW WITH NORMAN 858- 922--9361 | | Out to Review | 2325663 |
| Energy | Original | D | 6/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2325660 |
| Mechanical | Original | D | 6/23/2026 | TCRIPPEN | TCRIPPEN | DISAPPROVED * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2325659 |
| Mechanical (Main) | Original | / | 6/17/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2322630 |
| Plan Coordinator (Main) | Original | / | 6/17/2026 | | DANIELG | Location = Plan Coordinator (Main) by DANIELG | | Plan Coordinator (Main) | 2322624 |
| Electrical | Original | A | 6/17/2026 | DANIELG | DANIELG | | | Electrical | 2322623 |
| Electrical (Main) | Original | / | 6/16/2026 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 2322050 |
| Plan Coordinator (Main) | Original | / | 6/16/2026 | | MATTHEWA | Location = Plan Coordinator (Main) by MATTHEWA | | Plan Coordinator (Main) | 2322043 |
| Construction | Original | D | 6/16/2026 | MATTHEWA | MATTHEWA | King and trimmer details // Provide compliance with 2021 IECC section R408.2.1 // IECC form U-factor values do not meet minimum requirements * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2322042 |
| Energy | Original | / | 6/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2322038 |
| Construction (Main) | Original | / | 6/16/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Construction (Main) | 2322037 |
| Construction (Main) | Original | / | 6/12/2026 | | SCANNING | Location = Construction (Main) by SCANNING | | Construction (Main) | 2320382 |
| Plan Coordinator (Main) | Original | / | 6/12/2026 | | QUINTONW | Location = Plan Coordinator (Main) by QUINTONW | | Plan Coordinator (Main) | 2320323 |
| Submittal 2 | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2320320 |
| Out to Review | Original | / | 6/8/2026 | MELISSAF | MELISSAF | NORMAN WALKING 8589229361 | | Out to Review | 2317751 |
| WP Floodplain | Original | N | 6/4/2026 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2316254 |
| WP Enumeration | Original | A | 6/4/2026 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data. | | WP Enumeration | 2316253 |
| WP Zoning | Original | D | 6/4/2026 | DBURGESS | DBURGESS | An addition to the primary residence is a change to the zoning footprint, which requires a Zoning Development Permit (ZDP) to properly verify and document conformance with the City Unified Development Code (UDC). Use the City Multi-Use Zoning Development Permit which can be downloaded from the City's website at: https://woodlandpark.gov/235/Forms-Documents Please contact the Woodland Park Planning Department at (719) 687-5202 with questions.
Plans are shown as being in "Woodland Park". They are not. They may be in the "Woodland Park Bin" or perhaps with the customer. | | WP Zoning | 2316252 |
| Woodland Park | Original | / | 6/1/2026 | | SCANNING | Location = Woodland Park by SCANNING | | Woodland Park | 2314602 |
| Plan Coordinator (Main) | Original | / | 6/1/2026 | | SHANEN | Location = Plan Coordinator (Main) by SHANEN | | Plan Coordinator (Main) | 2314560 |
| Plumbing | Original | N | 6/1/2026 | SHANEN | SHANEN | No plumbing scope indicated. | | Plumbing | 2314558 |
| Plumbing (Main) | Original | / | 6/1/2026 | | SCANNING | Location = Plumbing (Main) by SCANNING | | Plumbing (Main) | 2314503 |
| Mechanical | Original | D | 5/29/2026 | TCRIPPEN | TCRIPPEN | Disapproved: provide manufacture manual for gas stove, * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2314064 |
| Mechanical (Main) | Original | / | 5/28/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2313497 |
| Plan Coordinator (Main) | Original | / | 5/28/2026 | | CONNERM | Location = Plan Coordinator (Main) by CONNERM | | Plan Coordinator (Main) | 2313446 |
| Electrical | Original | D | 5/28/2026 | CONNERM | CONNERM | Provide electrical plans for addition * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2313445 |
| Electrical (Main) | Original | / | 5/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electrical (Main) | 2313442 |
| Electrical (Main) | Original | / | 5/28/2026 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 2313439 |
| Plan Coordinator (Main) | Original | / | 5/28/2026 | | MATTHEWA | Location = Plan Coordinator (Main) by MATTHEWA | | Plan Coordinator (Main) | 2313238 |
| Construction | Original | D | 5/28/2026 | MATTHEWA | MATTHEWA | Design Criteria // Incorrect version of IECC form // Sunroom requirements not met // Missing framing details for window openings * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2313235 |
| Construction (Main) | Original | / | 5/28/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Construction (Main) | 2313120 |
| Construction (Main) | Original | / | 5/7/2026 | | SCANNING | Location = Construction (Main) by SCANNING | | Construction (Main) | 2304668 |
| Plan Coordinator (Main) | Original | / | 5/7/2026 | | NICOLASV | Location = Plan Coordinator (Main) by NICOLASV | | Plan Coordinator (Main) | 2304642 |
| Out to Review | Original | / | 5/7/2026 | NICOLASV | NICOLASV | Norm Walking 8589229361 | | Out to Review | 2304641 |
| Plan Coordinator (Main) | Original | / | 5/7/2026 | | NICOLASV | Location = Plan Coordinator (Main) by NICOLASV | | Plan Coordinator (Main) | 2304638 |
| Energy | Original | N | 5/7/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2304636 |