| Out to Review | Original | / | 8/11/2026 | MATTHEWA | MATTHEWA | Norm walking | | Out to Review | 2346192 |
| Energy | Original | A | 8/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2346190 |
| Construction | Original | A | 8/11/2026 | MATTHEWA | MATTHEWA | Approved as noted on plans | | Construction | 2346189 |
| Energy | Original | / | 8/11/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2346188 |
| WP Zoning | Original | A | 8/10/2026 | DBURGESS | DBURGESS | ZDP approved with Conditions by D. Burgess on 6/18/2026. Pre-construction meeting required - contact City Inspector Cyrus Hoagland at (719) 243-4507 to schedule. | | WP Zoning | 2345621 |
| Woodland Park | Original | / | 8/10/2026 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 2345609 |
| Woodland Park Bin | Original | / | 8/6/2026 | NELIDA | NELIDA | Shaun's desk. | | Woodland Park Bin | 2344350 |
| Mechanical | Original | A | 8/6/2026 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2344341 |
| Energy | Original | D | 8/6/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2344342 |
| Mechanical (Main) | Original | / | 8/6/2026 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Mechanical (Main) | 2344310 |
| Construction | Original | D | 8/6/2026 | MATTHEWA | MATTHEWA | To utilize the option of “N/A” on the additional energy efficiency option on the 2021 IECC Amended form, total building performance or energy rating index must be used for your method of energy code compliance. Compliance report must be provided for the option selected. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2344305 |
| Mechanical (Main) | Original | / | 8/6/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Mechanical (Main) | 2344211 |
| Mechanical (Main) | Original | / | 7/8/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2331865 |
| Plan Coordinator (Main) | Original | / | 7/8/2026 | | NICOLASV | Location = Plan Coordinator (Main) by NICOLASV | | Plan Coordinator (Main) | 2331831 |
| | Original | / | 7/8/2026 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2331816 |
| Submittal 3 | Original | / | 7/8/2026 | NICOLASV | NICOLASV | Submittal #3 | | Submittal 3 | 2331815 |
| Out to Review | Original | / | 6/23/2026 | TCRIPPEN | TCRIPPEN | PLAN OUT TO REVIEW WITH NORMAN 858- 922--9361 | | Out to Review | 2325663 |
| Energy | Original | D | 6/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2325660 |
| Mechanical | Original | D | 6/23/2026 | TCRIPPEN | TCRIPPEN | DISAPPROVED * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2325659 |
| Mechanical (Main) | Original | / | 6/17/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2322630 |
| Plan Coordinator (Main) | Original | / | 6/17/2026 | | DANIELG | Location = Plan Coordinator (Main) by DANIELG | | Plan Coordinator (Main) | 2322624 |
| Electrical | Original | A | 6/17/2026 | DANIELG | DANIELG | | | Electrical | 2322623 |
| Electrical (Main) | Original | / | 6/16/2026 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 2322050 |
| Plan Coordinator (Main) | Original | / | 6/16/2026 | | MATTHEWA | Location = Plan Coordinator (Main) by MATTHEWA | | Plan Coordinator (Main) | 2322043 |
| Construction | Original | D | 6/16/2026 | MATTHEWA | MATTHEWA | King and trimmer details // Provide compliance with 2021 IECC section R408.2.1 // IECC form U-factor values do not meet minimum requirements * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2322042 |
| Energy | Original | / | 6/16/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2322038 |
| Construction (Main) | Original | / | 6/16/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Construction (Main) | 2322037 |
| Construction (Main) | Original | / | 6/12/2026 | | SCANNING | Location = Construction (Main) by SCANNING | | Construction (Main) | 2320382 |
| Plan Coordinator (Main) | Original | / | 6/12/2026 | | QUINTONW | Location = Plan Coordinator (Main) by QUINTONW | | Plan Coordinator (Main) | 2320323 |
| Submittal 2 | Original | / | 6/12/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2320320 |
| Out to Review | Original | / | 6/8/2026 | MELISSAF | MELISSAF | NORMAN WALKING 8589229361 | | Out to Review | 2317751 |
| WP Floodplain | Original | N | 6/4/2026 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2316254 |
| WP Enumeration | Original | A | 6/4/2026 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data. | | WP Enumeration | 2316253 |
| WP Zoning | Original | D | 6/4/2026 | DBURGESS | DBURGESS | An addition to the primary residence is a change to the zoning footprint, which requires a Zoning Development Permit (ZDP) to properly verify and document conformance with the City Unified Development Code (UDC). Use the City Multi-Use Zoning Development Permit which can be downloaded from the City's website at: https://woodlandpark.gov/235/Forms-Documents Please contact the Woodland Park Planning Department at (719) 687-5202 with questions.
Plans are shown as being in "Woodland Park". They are not. They may be in the "Woodland Park Bin" or perhaps with the customer. | | WP Zoning | 2316252 |
| Woodland Park | Original | / | 6/1/2026 | | SCANNING | Location = Woodland Park by SCANNING | | Woodland Park | 2314602 |
| Plan Coordinator (Main) | Original | / | 6/1/2026 | | SHANEN | Location = Plan Coordinator (Main) by SHANEN | | Plan Coordinator (Main) | 2314560 |
| Plumbing | Original | N | 6/1/2026 | SHANEN | SHANEN | No plumbing scope indicated. | | Plumbing | 2314558 |
| Plumbing (Main) | Original | / | 6/1/2026 | | SCANNING | Location = Plumbing (Main) by SCANNING | | Plumbing (Main) | 2314503 |
| Mechanical | Original | D | 5/29/2026 | TCRIPPEN | TCRIPPEN | Disapproved: provide manufacture manual for gas stove, * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2314064 |
| Mechanical (Main) | Original | / | 5/28/2026 | | SCANNING | Location = Mechanical (Main) by SCANNING | | Mechanical (Main) | 2313497 |
| Plan Coordinator (Main) | Original | / | 5/28/2026 | | CONNERM | Location = Plan Coordinator (Main) by CONNERM | | Plan Coordinator (Main) | 2313446 |
| Electrical | Original | D | 5/28/2026 | CONNERM | CONNERM | Provide electrical plans for addition * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2313445 |
| Electrical (Main) | Original | / | 5/28/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electrical (Main) | 2313442 |
| Electrical (Main) | Original | / | 5/28/2026 | | SCANNING | Location = Electrical (Main) by SCANNING | | Electrical (Main) | 2313439 |
| Plan Coordinator (Main) | Original | / | 5/28/2026 | | MATTHEWA | Location = Plan Coordinator (Main) by MATTHEWA | | Plan Coordinator (Main) | 2313238 |
| Construction | Original | D | 5/28/2026 | MATTHEWA | MATTHEWA | Design Criteria // Incorrect version of IECC form // Sunroom requirements not met // Missing framing details for window openings * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2313235 |
| Construction (Main) | Original | / | 5/28/2026 | MATTHEWA | MATTHEWA | In Current Review by MATTHEWA | | Construction (Main) | 2313120 |
| Construction (Main) | Original | / | 5/7/2026 | | SCANNING | Location = Construction (Main) by SCANNING | | Construction (Main) | 2304668 |
| Plan Coordinator (Main) | Original | / | 5/7/2026 | | NICOLASV | Location = Plan Coordinator (Main) by NICOLASV | | Plan Coordinator (Main) | 2304642 |
| Out to Review | Original | / | 5/7/2026 | NICOLASV | NICOLASV | Norm Walking 8589229361 | | Out to Review | 2304641 |
| Plan Coordinator (Main) | Original | / | 5/7/2026 | | NICOLASV | Location = Plan Coordinator (Main) by NICOLASV | | Plan Coordinator (Main) | 2304638 |
| Energy | Original | N | 5/7/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2304636 |