| Construction | Original | A | 8/17/2026 | JUSTINL | JUSTINL | No changes made to previously approved construction documents | | Construction | 2348741 |
| CO Springs Fire | Original | A | 8/17/2026 | CSFIRE | CSFIRE | FIRE FINAL NEEDED. TimberTech Harvest Class B Composite.
CSFD FCS: You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | nickbrown | CO Springs Fire | 2348703 |
| Electronic Plan | Original | / | 8/17/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2348693 |
| Submittal 4 | Original | / | 8/17/2026 | TREYW | TREYW | Submittal #4 | | Submittal 4 | 2348501 |
| CO Springs Fire | Original | D | 7/27/2026 | CSFIRE | CSFIRE | WUI Decks – Disapproval Project is disapproved due to use of Deckorators Costa, which carries a Class C flame-spread rating and does not meet ignition-resistant construction requirements for WUI Decks Class 2.
Class B Composite or Class A fire resistant material is all that can be used for deckboards. SEE ACCELA ACCOUNT FOR ADD COMMENTS. | nickbrown | CO Springs Fire | 2339410 |
| CO Springs DRE | Original | A | 7/9/2026 | CHUDSPETH | CHUDSPETH | Approved for a 10' x 14' uncovered deck under 8 ft high. Setbacks met. All Hillside Overly decks need to show a “limit of disturbance” (LOD) boundary around the construction area on the site plan. This should include the deck, material storage, equipment maneuvering and all construction activity and must NOT encroach into any preservation easement. After permit issuance but prior to construction activity, a LOD inspection is now required by contacting DREPlanningInfo@coloradosprings.gov . This will occur within 5 days of request and a 4’ construction fence needs to be in place on site in accordance with your approved plan. | | CO Springs DRE | 2332663 |
| Zoning/Planning | Original | / | 7/9/2026 | CHUDSPETH | CHUDSPETH | In Current Review by CHUDSPETH | | Zoning/Planning | 2332656 |
| Submittal 3 | Original | / | 7/9/2026 | MELISSAF | MELISSAF | Submittal #3 | | Submittal 3 | 2332593 |
| CO Springs DRE | Original | D | 7/8/2026 | CHUDSPETH | CHUDSPETH | Please upload a scaled site plan. Please add LOD to include the material storage. | | CO Springs DRE | 2331880 |
| CO Springs Fire | Original | D | 7/8/2026 | CSFIRE | CSFIRE | Admin disapproval | phil.valdez | CO Springs Fire | 2331875 |
| Zoning/Planning | Original | / | 7/7/2026 | CHUDSPETH | CHUDSPETH | In Current Review by CHUDSPETH | | Zoning/Planning | 2331527 |
| Construction | Original | A | 7/7/2026 | JUSTINL | JUSTINL | Approved as noted | | Construction | 2331372 |
| Electronic Plan | Original | / | 7/7/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2331365 |
| Submittal 2 | Original | / | 7/6/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2330394 |
| CO Springs Fire | Original | D | 7/1/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | CO Springs Fire | 2329766 |
| CO Springs DRE | Original | D | 6/10/2026 | KDODGE | KDODGE | On Site Plan, please provide: 1. dimensions of deck 2. height 3. covered or uncovered label 4. All Hillside Overly decks need to show a “limit of disturbance” (LOD) boundary around the construction area on the site plan. This should include the deck, material storage, equipment maneuvering and all construction activity and must NOT encroach into any preservation easement. After permit issuance but prior to construction activity, a LOD inspection is now required by contacting DREPlanningInfo@coloradosprings.gov . This will occur within 5 days of request and a 4’ construction fence, flags or caution tape needs to be in place on site in accordance with your approved plan. | | CO Springs DRE | 2318959 |
| Construction | Original | A | 6/9/2026 | JUSTINL | JUSTINL | | | Construction | 2318611 |
| Electronic Plan | Original | / | 6/9/2026 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2318592 |
| Energy | Original | N | 5/20/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2310180 |
| Floodplain | Original | N | 5/20/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7312413026) | | Floodplain | 2310179 |
| Fire | Original | / | 5/20/2026 | RBD GIS | RBD GIS | Parcel 7312413026 is within the Wildland Urban Interface (WUI). Fire Department Review is required. | | Fire | 2310178 |