| Mechanical | Original | D | 6/29/2026 | TCRIPPEN | TCRIPPEN | Disapproved * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2328281 |
| Electrical | Original | D | 6/15/2026 | CONNERM | CONNERM | Disapproved per phone call with Eric Rush * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2321515 |
| Construction | Original | D | 6/15/2026 | CONNERM | CONNERM | Disapproved per phone call with Eric Rush * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2321513 |
| Submittal 2 | Original | / | 6/15/2026 | NICOLASV | NICOLASV | Submittal #2 | | Submittal 2 | 2321313 |
| Mechanical | Original | D | 5/27/2026 | TCRIPPEN | TCRIPPEN | Disapproved * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2312229 |
| Monument Fire | Original | A | 5/26/2026 | MONUMENTFIRE | MONUMENTFIRE | “Battery system is reported as 6.2 kWh aggregate capacity. No PV array is proposed. Based on the 2021 IFC Section 1207.1.1 threshold for electrochemical ESS, the system is below the capacity requiring compliance with Section 1207. No fire permit/review is required by the IFC, subject to verification of aggregate capacity, listing, manufacturer installation instructions, electrical permit requirements, and any local amendments.” | SBenson9 | Monument Fire | 2312007 |
| Electrical | Original | D | 5/26/2026 | CONNERM | CONNERM | Provide conductor size, type, and quantity Provide over current protection sizes Label equipment as new or existing Portable batteries not allowed under NEC 400.12 Batteries must have UL 9540 listing. Provide specs for inverter/home panel * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2311890 |
| Electronic Plan | Original | / | 5/26/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2311883 |
| Construction | Original | D | 5/26/2026 | SHELLEY | SHELLEY | Demonstrate compliance with UL 9540A * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2311815 |
| | Original | / | 5/22/2026 | SYSTEM | SYSTEM | Plan Review fees paid 05/22/2026 for plan submitted 05/22/2026. Submit Date updated to now. Plan now open for review. | | | 2311446 |
| Energy | Original | N | 5/22/2026 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2311439 |
| Floodplain | Original | N | 5/22/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7125415036) | | Floodplain | 2311438 |