| CO Springs Fire | Original | D | 8/13/2026 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2347585 |
| Energy | Original | D | 8/3/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2342174 |
| Mechanical | Original | D | 8/3/2026 | TCRIPPEN | TCRIPPEN | Disapproved * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2342173 |
| CO Springs DRE | Original | D | 7/31/2026 | SSADLER | SSADLER | Upload the following documents: final recorded plat final approved landscaping and irrigation plans
City wide impact fees are due prior to building permit issuance. Contact Charla at charla.hudspeth@coloradosprings.gov | | CO Springs DRE | 2341775 |
| City Engr | Original | D | 7/30/2026 | JDAGNILLO | JDAGNILLO | Please submit financial assurances for all public street improvements along Parkmoor Village Dr. must be posted prior to building permit issuance by City Engineering. In addition, public street construction plans must be submitted separately to Engineering Development Review and Traffic Engineering and reviewed/approved prior to beginning of construction of all public right-of-way improvements. Thank you. | | City Engr | 2341340 |
| Stormwater | Original | D | 7/30/2026 | GHUNTLEY | GHUNTLEY | Missing GEC plan and permit | | Stormwater | 2341075 |
| CSU Contract Admin. | Original | N | 7/30/2026 | CSUAPPSPRM | CSUAPPSPRM | Applicable Development Utility charges and fees due prior to building permit. BS | bschifferstein | CSU Contract Admin. | 2340985 |
| CSU Water | Original | D | 7/30/2026 | CSUREVIEW | CSUREVIEW | CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions.
Refer to the current Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. SSH | SHillman | CSU Water | 2340967 |
| CSU Waste Water | Original | D | 7/30/2026 | CSUREVIEW | CSUREVIEW | CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. SSH | SHillman | CSU Waste Water | 2340966 |
| Gas/Elec. Utils | Original | A | 7/30/2026 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. SSH | SHillman | Gas/Elec. Utils | 2340964 |
| Electrical | Original | D | 7/30/2026 | CONNERM | CONNERM | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2340924 |
| Electrical | Original | D | 7/30/2026 | CONNERM | CONNERM | Show an EV ready space is noted in the garage
Provide a plan note for a 2-pole breaker space at the opposite end of the buss for Solar Ready. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2340851 |
| Electronic Plan | Original | / | 7/30/2026 | CONNERM | CONNERM | In Current Review by CONNERM | | Electronic Plan | 2340840 |
| Zoning/Planning | Original | / | 7/30/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2340813 |
| Plumbing | Original | D | 7/30/2026 | SHANEN | SHANEN | Plumbing review stopped and incomplete. Provided plumbing drawings are E and M unit plans and the architectural plans reference a 4-plex. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2340792 |
| Construction | Original | D | 7/29/2026 | SHELLEY | SHELLEY | Accessibility, rated construction, IECC - See plans * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2340759 |
| Electronic Plan | Original | / | 7/28/2026 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2340044 |
| Enumeration | Original | D | 7/17/2026 | AMY | AMY | Structural pages: 3655 Parkmoor Village Drive is not an address being used in the development. The zip code for this area is not 80108 but 80917. There are no townhome units. Each living space has their own address. The unit numbers were crossed out by Enumerations.
Architectural, Mechanical, Electrical, Plumbing pages: shows 3031, this address is 3131. This was corrected.
If the above pages get changed out the information needs to be corrected by you.
Plan approval is pending in the Enumerations department based on Enumerations needing to review the mylar prior to plat, collection of plat fees and a copy of the final recorded plat. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2335593 |
| Electronic Plan | Original | / | 7/16/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2335431 |
| Submittal 2 | Original | / | 7/16/2026 | MELISSAF | MELISSAF | Submittal #2 | | Submittal 2 | 2335294 |
| Plan Coordinator (Main) | Original | D | 7/13/2026 | AMY | AMY | Disapprove all remaining departments to allow plan to be resubmitted-Addressing to the area was never assigned. New addresses have been assigned this morning. Submit this plan and future plans with the new addresses assigned to each lot. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plan Coordinator (Main) | 2333596 |
| Electronic Plan | Original | / | 7/13/2026 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2333324 |
| | Original | / | 7/10/2026 | SYSTEM | SYSTEM | Plan Review fees paid 07/10/2026 for plan submitted 07/10/2026. Submit Date updated to now. Plan now open for review. | | | 2333016 |
| Energy | Original | / | 7/10/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2332873 |
| Floodplain | Original | N | 7/10/2026 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6334104024) | | Floodplain | 2332872 |